Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Road and bridge dotting equipment
The invention belongs to the technical field of road and bridge construction equipment, and particularly relates to road and bridge dotting equipment which comprises a fixing rod and a controller. A sliding rod is arranged on the side, close to the top, of the fixing rod in a sleeving mode, the sliding rod is fixed to the fixing rod through a positioning bolt, the other end of the sliding rod is fixedly connected with a handrail, the bottom of the sliding rod is rotationally connected with a roller, and the outer side of the fixing rod is slidably connected with a charging tray.In the prior art, when roads and bridges are dotted outdoors, accumulated water, snow or ice happens on the road surface. Direct dotting can cause infirm mark attachment and unclear marks, the road surface at the dotting position needs to be cleaned before dotting, a cleaning tool needs to be carried, the cleaning process is time-consuming and labor-consuming, and the dotting efficiency is influenced. According to the equipment, through arrangement of the sweeping blades, the ground can be conveniently cleaned before dotting, the labor intensity of workers is relieved, the coating makes better contact with the ground, and therefore dotting marks are firmer.
本发明属于道路桥梁施工设备技术领域,具体的说是一种道路桥梁打点设备,包括固定杆和控制器;所述固定杆靠近顶部一侧套设有滑杆,滑杆通过定位螺栓固定在固定杆上,滑杆的另一端固连有扶手,滑杆的底部转动连接有滚轮,所述固定杆外侧滑动连接有料盘,现有技术中,道路桥梁打点在室外施工,路面会有积水、积雪或者结冰等情况,直接打点会导致标记附着不牢靠,导致标记不清晰,在打点之前需要对打点位置的路面进行清理,需要携带清理工具,且清洁过程费时费力,影响打点效率;本发明中,通过设置清扫叶片,便于在打点前对地面进行清理,减轻人员的劳动强度,使得涂料与地面接触更好,从而使得打点的标记更加牢靠。
Road and bridge dotting equipment
The invention belongs to the technical field of road and bridge construction equipment, and particularly relates to road and bridge dotting equipment which comprises a fixing rod and a controller. A sliding rod is arranged on the side, close to the top, of the fixing rod in a sleeving mode, the sliding rod is fixed to the fixing rod through a positioning bolt, the other end of the sliding rod is fixedly connected with a handrail, the bottom of the sliding rod is rotationally connected with a roller, and the outer side of the fixing rod is slidably connected with a charging tray.In the prior art, when roads and bridges are dotted outdoors, accumulated water, snow or ice happens on the road surface. Direct dotting can cause infirm mark attachment and unclear marks, the road surface at the dotting position needs to be cleaned before dotting, a cleaning tool needs to be carried, the cleaning process is time-consuming and labor-consuming, and the dotting efficiency is influenced. According to the equipment, through arrangement of the sweeping blades, the ground can be conveniently cleaned before dotting, the labor intensity of workers is relieved, the coating makes better contact with the ground, and therefore dotting marks are firmer.
本发明属于道路桥梁施工设备技术领域,具体的说是一种道路桥梁打点设备,包括固定杆和控制器;所述固定杆靠近顶部一侧套设有滑杆,滑杆通过定位螺栓固定在固定杆上,滑杆的另一端固连有扶手,滑杆的底部转动连接有滚轮,所述固定杆外侧滑动连接有料盘,现有技术中,道路桥梁打点在室外施工,路面会有积水、积雪或者结冰等情况,直接打点会导致标记附着不牢靠,导致标记不清晰,在打点之前需要对打点位置的路面进行清理,需要携带清理工具,且清洁过程费时费力,影响打点效率;本发明中,通过设置清扫叶片,便于在打点前对地面进行清理,减轻人员的劳动强度,使得涂料与地面接触更好,从而使得打点的标记更加牢靠。
Road and bridge dotting equipment
一种道路桥梁打点设备
MIAO CUIPING (Autor:in) / HU YAOZONG (Autor:in) / CAI DAN (Autor:in) / HE XUECHUN (Autor:in) / WU YUEHUA (Autor:in) / WANG HENG (Autor:in)
11.02.2022
Patent
Elektronische Ressource
Chinesisch
Road and bridge construction distance mark dotting equipment and method thereof
Europäisches Patentamt | 2024
|Road and bridge dotting device for municipal construction
Europäisches Patentamt | 2023
|Dotting device for municipal road and bridge construction
Europäisches Patentamt | 2023
|