Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Road and bridge construction distance mark dotting equipment and method thereof
The invention discloses road and bridge construction distance mark dotting equipment and a method thereof.The road and bridge construction distance mark dotting equipment comprises a vehicle body, a case and first rolling tracks, the first rolling tracks capable of annularly rolling are installed on the left side and the right side of the vehicle body correspondingly, and the case used for controlling operation is installed at the top of the vehicle body; a first rolling track annularly rolls in a mode of rolling on a first driving wheel and a first auxiliary wheel, so that a vehicle body can be driven by the first rolling track to move, and the angle of a second rolling track is adjusted in a mode of cooperating with a second driving wheel to do circumferential movement; the vehicle body can be warped up with the second rolling track as a fulcrum to avoid obstacles, so that the dotting marking position of a follow-up device is accurate, a worker does not need to repeatedly calculate during measurement and calculation, and the dotting marking precision of the device is improved.
本发明公开了一种道路桥梁施工距离标记打点设备及其方法,包括车体、机箱和第一滚动履带,所述车体的左右两侧均安装有可进行环形滚动第一滚动履带,所述车体的顶部安装有用于控制运行的机箱;通过设置第一滚动履带在第一驱动轮和第一辅助轮进行滚动的方式进行环形滚动,使得在车体能够在第一滚动履带的驱动下进行移动,并配合第二驱动轮进行圆周活动的方式调节第二滚动履带的角度,使得车体能够以第二滚动履带为支点翘起进行避障,从而导致后续装置的打点标记位置准确,工作人员进行测量计算时不需要反复计算,提高装置打点标记的精度。
Road and bridge construction distance mark dotting equipment and method thereof
The invention discloses road and bridge construction distance mark dotting equipment and a method thereof.The road and bridge construction distance mark dotting equipment comprises a vehicle body, a case and first rolling tracks, the first rolling tracks capable of annularly rolling are installed on the left side and the right side of the vehicle body correspondingly, and the case used for controlling operation is installed at the top of the vehicle body; a first rolling track annularly rolls in a mode of rolling on a first driving wheel and a first auxiliary wheel, so that a vehicle body can be driven by the first rolling track to move, and the angle of a second rolling track is adjusted in a mode of cooperating with a second driving wheel to do circumferential movement; the vehicle body can be warped up with the second rolling track as a fulcrum to avoid obstacles, so that the dotting marking position of a follow-up device is accurate, a worker does not need to repeatedly calculate during measurement and calculation, and the dotting marking precision of the device is improved.
本发明公开了一种道路桥梁施工距离标记打点设备及其方法,包括车体、机箱和第一滚动履带,所述车体的左右两侧均安装有可进行环形滚动第一滚动履带,所述车体的顶部安装有用于控制运行的机箱;通过设置第一滚动履带在第一驱动轮和第一辅助轮进行滚动的方式进行环形滚动,使得在车体能够在第一滚动履带的驱动下进行移动,并配合第二驱动轮进行圆周活动的方式调节第二滚动履带的角度,使得车体能够以第二滚动履带为支点翘起进行避障,从而导致后续装置的打点标记位置准确,工作人员进行测量计算时不需要反复计算,提高装置打点标记的精度。
Road and bridge construction distance mark dotting equipment and method thereof
一种道路桥梁施工距离标记打点设备及其方法
SUN JIANJUN (Autor:in)
20.12.2024
Patent
Elektronische Ressource
Chinesisch
Road and bridge construction distance marking and dotting equipment and method thereof
Europäisches Patentamt | 2022
|Road and bridge dotting method for municipal construction
Europäisches Patentamt | 2020
|