Precise control slope brushing method
The invention discloses a precise control slope brushing method and relates to the technical field of earthwork construction. The method comprises the following steps of 1, capping and pouring an intercepting ditch; 2, fixing a stay wire on a basic plane; 3, a slope being finely brushed; 4, measuring with a tape; 5, a formwork being installed; 6, retesting; and 7, pouring and maintaining. The construction method is advantaged in that the construction method is optimized, over-excavation or under-excavation is avoided, errors are reduced, slope brushing is precisely controlled, measuring personnel on a construction site are reduced, the slope brushing construction progress is accelerated, construction efficiency is improved, concrete over-excavation is reduced, and construction cost is saved.
一种精控刷坡方法,涉及土方施工的技术领域,包括以下步骤:第一步、封顶和截水沟浇筑;第二步、基础面拉线固定;第三步、精刷坡;第四步、卷尺测量;第五步、安装模板;第六步、复测;第七步、浇筑养护。本发明的有益效果在于:本发明的有益效果在于:优化施工方法,避免超挖或欠挖,减小误差,精控刷坡,减少施工现场测量人员、加快刷坡施工进度,提高施工效率,减少了混凝土超方,节约施工成本。
Precise control slope brushing method
The invention discloses a precise control slope brushing method and relates to the technical field of earthwork construction. The method comprises the following steps of 1, capping and pouring an intercepting ditch; 2, fixing a stay wire on a basic plane; 3, a slope being finely brushed; 4, measuring with a tape; 5, a formwork being installed; 6, retesting; and 7, pouring and maintaining. The construction method is advantaged in that the construction method is optimized, over-excavation or under-excavation is avoided, errors are reduced, slope brushing is precisely controlled, measuring personnel on a construction site are reduced, the slope brushing construction progress is accelerated, construction efficiency is improved, concrete over-excavation is reduced, and construction cost is saved.
一种精控刷坡方法,涉及土方施工的技术领域,包括以下步骤:第一步、封顶和截水沟浇筑;第二步、基础面拉线固定;第三步、精刷坡;第四步、卷尺测量;第五步、安装模板;第六步、复测;第七步、浇筑养护。本发明的有益效果在于:本发明的有益效果在于:优化施工方法,避免超挖或欠挖,减小误差,精控刷坡,减少施工现场测量人员、加快刷坡施工进度,提高施工效率,减少了混凝土超方,节约施工成本。
Precise control slope brushing method
一种精控刷坡方法
WANG YUBIAO (Autor:in) / ZHAO HAIFENG (Autor:in) / YIN GUOHAI (Autor:in) / WANG XINGYONG (Autor:in) / ZHANG YUJUAN (Autor:in) / LIU HUAPENG (Autor:in) / LIU SHUANGLONG (Autor:in) / ZHOU YINGHAO (Autor:in) / LU YAO (Autor:in) / WU GUANGLONG (Autor:in)
18.02.2022
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Slope control device and method for slope brushing operation of excavator
Europäisches Patentamt | 2020
|Building coating brushing equipment and brushing method
Europäisches Patentamt | 2024
|