Prefabricated installation construction method for steel-concrete composite beam bridge deck slab
The invention discloses a prefabricated installation construction method for a steel-concrete composite beam bridge deck slab, which comprises the following steps: carrying out three-dimensional space motion fine adjustment simulation through a BIM model, correcting the BIM model of a bridge deck slab by using actual erection data of an I-shaped steel beam, carrying out layer-by-layer simulation, and guiding prefabrication and installation of the bridge deck slab by using simulation data, thereby eliminating possible problems in accurate in-position of the bridge deck slab. According to the method, installation failure during installation is avoided, the construction precision of the bridge deck slab is ensured, pre-laying simulation of the bridge deck slab is carried out in advance in the BIM model, enough time is provided for bridge deck slab customization, and the construction period is prevented from being affected.
本发明公开了一种钢混组合梁桥面板预制安装施工方法,通过BIM模型进行三维空间运动精调仿真,用工字钢梁的实际架设数据纠正桥面板的BIM模型,层层模拟,用模拟数据指导桥面板的预制和安装,从而消除桥面板精确就位中可能出现的问题,避免安装时安装不上,确保桥面板的施工精度,且通过提前在BIM模型中进行桥面板的预铺设模拟,为桥面板定制提供了足够时间,避免影响施工工期。
Prefabricated installation construction method for steel-concrete composite beam bridge deck slab
The invention discloses a prefabricated installation construction method for a steel-concrete composite beam bridge deck slab, which comprises the following steps: carrying out three-dimensional space motion fine adjustment simulation through a BIM model, correcting the BIM model of a bridge deck slab by using actual erection data of an I-shaped steel beam, carrying out layer-by-layer simulation, and guiding prefabrication and installation of the bridge deck slab by using simulation data, thereby eliminating possible problems in accurate in-position of the bridge deck slab. According to the method, installation failure during installation is avoided, the construction precision of the bridge deck slab is ensured, pre-laying simulation of the bridge deck slab is carried out in advance in the BIM model, enough time is provided for bridge deck slab customization, and the construction period is prevented from being affected.
本发明公开了一种钢混组合梁桥面板预制安装施工方法,通过BIM模型进行三维空间运动精调仿真,用工字钢梁的实际架设数据纠正桥面板的BIM模型,层层模拟,用模拟数据指导桥面板的预制和安装,从而消除桥面板精确就位中可能出现的问题,避免安装时安装不上,确保桥面板的施工精度,且通过提前在BIM模型中进行桥面板的预铺设模拟,为桥面板定制提供了足够时间,避免影响施工工期。
Prefabricated installation construction method for steel-concrete composite beam bridge deck slab
一种钢混组合梁桥面板预制安装施工方法
LI ZHAOJIU (Autor:in) / WANG MINGGANG (Autor:in) / ZHAO YONGQIANG (Autor:in) / CAO SHAOHUA (Autor:in) / LIN FENG (Autor:in) / HUANG MIN (Autor:in) / LI YONG (Autor:in)
25.02.2022
Patent
Elektronische Ressource
Chinesisch
Steel concrete beam bridge deck slab prefabricated construction method
Europäisches Patentamt | 2020
|Europäisches Patentamt | 2022
|Prefabricated bridge deck steel-concrete composite beam construction method
Europäisches Patentamt | 2021
|Europäisches Patentamt | 2020
|Europäisches Patentamt | 2023
|