Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Assembly type operation platform of compound fertilizer granulation high tower and construction method of assembly type operation platform
The invention discloses an assembly type operation platform of a compound fertilizer granulation high tower and a construction method thereof, the operation platform comprises: two truss side beams which are arranged in parallel at an interval, and two ends of the two truss side beams are respectively fixed on the inner tower wall of the high tower; the light prefabricated bottom plate is fixedly mounted between the bottom ends of the two truss side beams; and the multiple transverse supporting top rods are arranged at intervals, and the two ends of the multiple transverse supporting top rods are fixedly installed between the top ends of the two truss side beams correspondingly. The operation platform is simple in structure and light in weight, the truss side beams and the light prefabricated bottom plate are machined under the tower, then the machined truss side beams and the light prefabricated bottom plate are hoisted to the tower to be installed, and the operation platform has the advantages of being short in construction time, low in construction cost, high in safety and easy to construct and install.
本发明公开了一种复合肥造粒高塔的装配式操作平台及其施工方法,其操作平台包括:桁架侧梁,所述桁架侧梁为平行间隔布置的两个,且两个所述桁架侧梁的两端分别固定在高塔的内塔壁上;轻质预制底板,所述轻质预制底板固定安装在两个所述桁架侧梁底端之间;横撑顶杆,所述横撑顶杆为间隔布置的多个,且多个所述横撑顶杆两端分别固定安装在两个所述桁架侧梁顶端之间。本发明中的操作平台不仅结构简单、质量轻,而且采用塔下加工桁架侧梁和轻质预制底板,然后再将加工好的桁架侧梁和轻质预制底板吊装到塔上安装,具有施工时间短、施工成本低、安全性高、易于施工安装的优点。
Assembly type operation platform of compound fertilizer granulation high tower and construction method of assembly type operation platform
The invention discloses an assembly type operation platform of a compound fertilizer granulation high tower and a construction method thereof, the operation platform comprises: two truss side beams which are arranged in parallel at an interval, and two ends of the two truss side beams are respectively fixed on the inner tower wall of the high tower; the light prefabricated bottom plate is fixedly mounted between the bottom ends of the two truss side beams; and the multiple transverse supporting top rods are arranged at intervals, and the two ends of the multiple transverse supporting top rods are fixedly installed between the top ends of the two truss side beams correspondingly. The operation platform is simple in structure and light in weight, the truss side beams and the light prefabricated bottom plate are machined under the tower, then the machined truss side beams and the light prefabricated bottom plate are hoisted to the tower to be installed, and the operation platform has the advantages of being short in construction time, low in construction cost, high in safety and easy to construct and install.
本发明公开了一种复合肥造粒高塔的装配式操作平台及其施工方法,其操作平台包括:桁架侧梁,所述桁架侧梁为平行间隔布置的两个,且两个所述桁架侧梁的两端分别固定在高塔的内塔壁上;轻质预制底板,所述轻质预制底板固定安装在两个所述桁架侧梁底端之间;横撑顶杆,所述横撑顶杆为间隔布置的多个,且多个所述横撑顶杆两端分别固定安装在两个所述桁架侧梁顶端之间。本发明中的操作平台不仅结构简单、质量轻,而且采用塔下加工桁架侧梁和轻质预制底板,然后再将加工好的桁架侧梁和轻质预制底板吊装到塔上安装,具有施工时间短、施工成本低、安全性高、易于施工安装的优点。
Assembly type operation platform of compound fertilizer granulation high tower and construction method of assembly type operation platform
一种复合肥造粒高塔的装配式操作平台及其施工方法
QIU HONGSHENG (Autor:in) / QIU RUIHAN (Autor:in) / WU YIFEI (Autor:in) / WANG YAOSEN (Autor:in) / FU YIXIN (Autor:in) / WU KAIKUN (Autor:in) / MA LI (Autor:in) / GUI JUNJIE (Autor:in)
04.03.2022
Patent
Elektronische Ressource
Chinesisch
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Steel bridge deck assembly type operation platform construction method
Europäisches Patentamt | 2024
|Externally-hung assembly type cantilever operation platform and construction method
Europäisches Patentamt | 2024
|