Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Construction method for edge-covered soil of cement-stabilized base layer
The invention relates to the technical field of pavement cement-stabilized base construction, in particular to a cement-stabilized base edge covering soil construction method. According to the method, the construction of the earth shoulder of the cement-stabilized layer is changed into the construction of the cement-stabilized layer after earthwork paving and rolling forming, so that the construction mode that the cement-stabilized layer is firstly constructed and then the earth shoulder is constructed in the construction of erecting the cement-stabilized layer in the original conventional scheme is thoroughly changed, and the change of the process technology method can greatly improve the working efficiency; in addition, the cost generated by supporting and disassembling the formwork is reduced, and the rolling effect of the compaction degree of the earth shoulder can be effectively improved.
本发明涉及路面水稳基层施工技术领域,具体为一种水稳基层包边土施工方法。该方法把水稳层土路肩施工改为先摊铺土方碾压成型后施工水稳层,彻底改变原有常规方案中支立水稳层施工中边部模板先施工水稳后施工土路肩的施工模式,此种工艺技术方法的改变能在工效上大大提高,并且减少了支拆模板产生的费用,还能有效提高土路肩压实度的碾压效果。
Construction method for edge-covered soil of cement-stabilized base layer
The invention relates to the technical field of pavement cement-stabilized base construction, in particular to a cement-stabilized base edge covering soil construction method. According to the method, the construction of the earth shoulder of the cement-stabilized layer is changed into the construction of the cement-stabilized layer after earthwork paving and rolling forming, so that the construction mode that the cement-stabilized layer is firstly constructed and then the earth shoulder is constructed in the construction of erecting the cement-stabilized layer in the original conventional scheme is thoroughly changed, and the change of the process technology method can greatly improve the working efficiency; in addition, the cost generated by supporting and disassembling the formwork is reduced, and the rolling effect of the compaction degree of the earth shoulder can be effectively improved.
本发明涉及路面水稳基层施工技术领域,具体为一种水稳基层包边土施工方法。该方法把水稳层土路肩施工改为先摊铺土方碾压成型后施工水稳层,彻底改变原有常规方案中支立水稳层施工中边部模板先施工水稳后施工土路肩的施工模式,此种工艺技术方法的改变能在工效上大大提高,并且减少了支拆模板产生的费用,还能有效提高土路肩压实度的碾压效果。
Construction method for edge-covered soil of cement-stabilized base layer
一种水稳基层包边土施工方法
YANG DONG (Autor:in) / KIM DUK-HEE (Autor:in) / XU YONGQIANG (Autor:in) / TANG LIANG (Autor:in) / NING DEHAO (Autor:in) / HUA LONG (Autor:in) / WANG LIJIA (Autor:in) / LIU BINGQIANG (Autor:in) / LI YI (Autor:in) / YUAN DESHI (Autor:in)
15.03.2022
Patent
Elektronische Ressource
Chinesisch
IPC:
E01C
Bau von Straßen, Sportplätzen oder dgl., Decken dafür
,
CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE
Soil mold construction method for cement stabilized macadam base layer
Europäisches Patentamt | 2021
|Europäisches Patentamt | 2021
|Europäisches Patentamt | 2024
|Construction method of cement-stabilized solid waste aggregate base layer
Europäisches Patentamt | 2022
|