Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Highway sand prevention method in high wind energy area
The invention relates to the technical field of wind and sand prevention and control, and provides a high wind energy area road sand prevention method which comprises the steps that a sand blocking belt, a sand fixing belt and a sand conveying belt are sequentially arranged on the windward side of a roadbed of a road in the wind and sand flow leading direction, the sand blocking belt and the sand fixing belt are spaced, and the sand conveying belt is arranged adjacent to the roadbed and connected with the sand fixing belt; the sand blocking belt, the sand fixing belt and the sand conveying belt are sequentially arranged from high to low. The sand prevention effect can be improved, sand accumulation bodies are effectively prevented from gathering and invading the highway pavement, and the smoothness of the road is guaranteed; in addition, a large amount of accumulated sand does not need to be cleaned in the using process, the middle and later maintenance cost is low, the sustainable protection performance is high, and the service life is long.
本发明涉及风沙防治技术领域,提供了一种高风能区公路防沙方法,包括:沿着风沙流主导方向,在公路的路基上风侧依次设置阻沙带、固沙带和输沙带,所述阻沙带与所述固沙带有间距,所述输沙带邻近所述路基布置且与所述固沙带相连;所述阻沙带、所述固沙带和所述输沙带由高到低依次排布。本发明可以提高防沙效果,有效防止积沙体聚集入侵公路路面,保证道路的通畅性;并且本发明在使用过程中无需大量清理积沙体,中后期维护成本低,可持续防护性强,使用寿命长。
Highway sand prevention method in high wind energy area
The invention relates to the technical field of wind and sand prevention and control, and provides a high wind energy area road sand prevention method which comprises the steps that a sand blocking belt, a sand fixing belt and a sand conveying belt are sequentially arranged on the windward side of a roadbed of a road in the wind and sand flow leading direction, the sand blocking belt and the sand fixing belt are spaced, and the sand conveying belt is arranged adjacent to the roadbed and connected with the sand fixing belt; the sand blocking belt, the sand fixing belt and the sand conveying belt are sequentially arranged from high to low. The sand prevention effect can be improved, sand accumulation bodies are effectively prevented from gathering and invading the highway pavement, and the smoothness of the road is guaranteed; in addition, a large amount of accumulated sand does not need to be cleaned in the using process, the middle and later maintenance cost is low, the sustainable protection performance is high, and the service life is long.
本发明涉及风沙防治技术领域,提供了一种高风能区公路防沙方法,包括:沿着风沙流主导方向,在公路的路基上风侧依次设置阻沙带、固沙带和输沙带,所述阻沙带与所述固沙带有间距,所述输沙带邻近所述路基布置且与所述固沙带相连;所述阻沙带、所述固沙带和所述输沙带由高到低依次排布。本发明可以提高防沙效果,有效防止积沙体聚集入侵公路路面,保证道路的通畅性;并且本发明在使用过程中无需大量清理积沙体,中后期维护成本低,可持续防护性强,使用寿命长。
Highway sand prevention method in high wind energy area
一种高风能区公路防沙方法
WANG HAIFENG (Autor:in) / YU XIANGXIANG (Autor:in) / WANG SHIJIE (Autor:in) / LI SHENGYU (Autor:in) / XU XINWEN (Autor:in) / ZHANG WENLONG (Autor:in)
18.03.2022
Patent
Elektronische Ressource
Chinesisch
IPC:
E01F
ADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
,
Zusätzliche Baumaßnahmen, wie die Ausstattung von Straßen oder die bauliche Ausbildung von Bahnsteigen, Landeplätzen für Hubschrauber, Wegweisern, Schneezäunen oder dgl.
/
E02D
FOUNDATIONS
,
Gründungen
Europäisches Patentamt | 2022
|Sand and dust prevention device for highway construction
Europäisches Patentamt | 2020
|Wind-energy wind-prevention and sand-fixation grass grid laying vehicle
Europäisches Patentamt | 2023
|