Anti-sedimentation well lid well periphery reinforcing structure and construction method
The invention discloses an anti-sedimentation well lid well periphery reinforcing structure and a construction method, the anti-sedimentation well lid well periphery reinforcing structure comprises a subbase layer, a first base layer, a second base layer, a lower surface layer and an upper surface layer from bottom to top, an unloading plate is arranged on the inner side of the second base layer, an upper limiting cylinder is arranged on the inner side of the unloading plate, and a lower limiting cylinder is arranged below the upper limiting cylinder; an adjusting ring, a mortar layer and a shaft are arranged on the outer side of the lower limiting cylinder from top to bottom, and an anti-sedimentation well lid is arranged on the upper limiting cylinder. The construction method has the following advantages that the structural design is reasonable, construction operation is convenient, the well periphery engineering quality can be effectively improved, the overall flatness of the urban road pavement and the driving comfort are improved, and the construction efficiency and the mechanization degree of the road anti-sedimentation well lid are greatly improved.
本发明公开了一种防沉降井盖井周加固结构及施工方法,包括自下而上的底基层、第一基层、第二基层、下面层和上面层,所述第二基层内侧设置有卸荷板,所述卸荷板内侧设置有上限位筒,所述上限位筒下方设置有下限位筒,所述下限位筒的外侧自上而下设置有调节圈、砂浆层和井筒,所述上限位筒上设置有防沉降井盖。本发明具有如下优点:结构设计合理,便于施工操作,可以有效提高井周工程质量,提升城市道路路面整体平整度和行车舒适性,极大提高了道路防沉降井盖施工的效率和机械化程度。
Anti-sedimentation well lid well periphery reinforcing structure and construction method
The invention discloses an anti-sedimentation well lid well periphery reinforcing structure and a construction method, the anti-sedimentation well lid well periphery reinforcing structure comprises a subbase layer, a first base layer, a second base layer, a lower surface layer and an upper surface layer from bottom to top, an unloading plate is arranged on the inner side of the second base layer, an upper limiting cylinder is arranged on the inner side of the unloading plate, and a lower limiting cylinder is arranged below the upper limiting cylinder; an adjusting ring, a mortar layer and a shaft are arranged on the outer side of the lower limiting cylinder from top to bottom, and an anti-sedimentation well lid is arranged on the upper limiting cylinder. The construction method has the following advantages that the structural design is reasonable, construction operation is convenient, the well periphery engineering quality can be effectively improved, the overall flatness of the urban road pavement and the driving comfort are improved, and the construction efficiency and the mechanization degree of the road anti-sedimentation well lid are greatly improved.
本发明公开了一种防沉降井盖井周加固结构及施工方法,包括自下而上的底基层、第一基层、第二基层、下面层和上面层,所述第二基层内侧设置有卸荷板,所述卸荷板内侧设置有上限位筒,所述上限位筒下方设置有下限位筒,所述下限位筒的外侧自上而下设置有调节圈、砂浆层和井筒,所述上限位筒上设置有防沉降井盖。本发明具有如下优点:结构设计合理,便于施工操作,可以有效提高井周工程质量,提升城市道路路面整体平整度和行车舒适性,极大提高了道路防沉降井盖施工的效率和机械化程度。
Anti-sedimentation well lid well periphery reinforcing structure and construction method
一种防沉降井盖井周加固结构及施工工法
ZHANG HUANMIN (Autor:in) / ZHEN QI (Autor:in) / BAI LUTAO (Autor:in) / WANG XUCHEN (Autor:in) / WANG HENGNING (Autor:in) / LI MINGLEI (Autor:in) / WANG HAIBO (Autor:in) / LI JIA (Autor:in) / DU JIE (Autor:in) / GUO SHENGQUAN (Autor:in)
25.03.2022
Patent
Elektronische Ressource
Chinesisch
Europäisches Patentamt | 2024
|Road inspection well periphery reinforcing construction method and reinforcing structure
Europäisches Patentamt | 2024
|Reinforcing treatment construction method of periphery of road inspection well
Europäisches Patentamt | 2020
|Municipal road inspection well anti-sedimentation structure and construction method
Europäisches Patentamt | 2024
|Sewage discharge well with anti-sedimentation structure and construction method
Europäisches Patentamt | 2023
|