Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Prefabricated inspection well and assembling method thereof
The invention discloses a prefabricated inspection well and an assembling method thereof.The prefabricated inspection well comprises a base, a plurality of corner pieces, a plurality of plane pieces and a cover plate, the corner pieces and the plane pieces are all connected to the outer edge of the base, the two ends of each corner piece are connected to the two adjacent plane pieces correspondingly, and the cover plate is arranged on the base. A hollow cube structure is formed among the base, the corner pieces and the plane pieces, an opening is formed in the hollow cube structure, and the cover plate is arranged on the plane pieces and used for covering the opening. According to the prefabricated inspection well and the assembling method thereof, modular prefabrication of the inspection well is achieved, so that the prefabrication efficiency is improved, and meanwhile cost control is facilitated; the components are regular and suitable for prefabrication and assembly of the large inspection well, and transportation, hoisting or splicing are more convenient and faster; the first waterproof piece and the second waterproof piece are used for sealing the first seam and the second seam, the sealing performance of the component seam structure is high, and water leakage is effectively prevented.
本发明公开了一种预制检查井及其装配方法,该预制检查井包括底座、多个转角件、多个平面件和盖板,多个所述转角件和多个所述平面件均连接于所述底座的外边缘,且所述转角件的两端分别连接于相邻两个所述平面件,所述底座、多个所述转角件和多个所述平面件之间形成空心方体结构,所述空心方体结构上具有开口,所述盖板设置在所述平面件上并用于遮盖所述开口。本发明的预制检查井及其装配方法,使检查井模块化预制,从而提高预制效率,同时利于控制成本;构件规则,适用于大型检查井的预制装配,实现运输、吊装或拼装时更便捷;使用第一防水件和第二防水件将第一接缝和第二接缝处密封,构件接缝构造密封性高,有效防止水渗漏。
Prefabricated inspection well and assembling method thereof
The invention discloses a prefabricated inspection well and an assembling method thereof.The prefabricated inspection well comprises a base, a plurality of corner pieces, a plurality of plane pieces and a cover plate, the corner pieces and the plane pieces are all connected to the outer edge of the base, the two ends of each corner piece are connected to the two adjacent plane pieces correspondingly, and the cover plate is arranged on the base. A hollow cube structure is formed among the base, the corner pieces and the plane pieces, an opening is formed in the hollow cube structure, and the cover plate is arranged on the plane pieces and used for covering the opening. According to the prefabricated inspection well and the assembling method thereof, modular prefabrication of the inspection well is achieved, so that the prefabrication efficiency is improved, and meanwhile cost control is facilitated; the components are regular and suitable for prefabrication and assembly of the large inspection well, and transportation, hoisting or splicing are more convenient and faster; the first waterproof piece and the second waterproof piece are used for sealing the first seam and the second seam, the sealing performance of the component seam structure is high, and water leakage is effectively prevented.
本发明公开了一种预制检查井及其装配方法,该预制检查井包括底座、多个转角件、多个平面件和盖板,多个所述转角件和多个所述平面件均连接于所述底座的外边缘,且所述转角件的两端分别连接于相邻两个所述平面件,所述底座、多个所述转角件和多个所述平面件之间形成空心方体结构,所述空心方体结构上具有开口,所述盖板设置在所述平面件上并用于遮盖所述开口。本发明的预制检查井及其装配方法,使检查井模块化预制,从而提高预制效率,同时利于控制成本;构件规则,适用于大型检查井的预制装配,实现运输、吊装或拼装时更便捷;使用第一防水件和第二防水件将第一接缝和第二接缝处密封,构件接缝构造密封性高,有效防止水渗漏。
Prefabricated inspection well and assembling method thereof
预制检查井及其装配方法
MA LONGXIANG (Autor:in) / LU TENGTENG (Autor:in) / CHEN YU (Autor:in) / HE LIJIAN (Autor:in)
25.03.2022
Patent
Elektronische Ressource
Chinesisch
Prefabricated assembled working well and assembling method thereof
Europäisches Patentamt | 2020
|Prefabricated inspection well and construction method thereof
Europäisches Patentamt | 2015
|Prefabricated inspection well and construction method thereof
Europäisches Patentamt | 2020
|Prefabricated assembled inspection well and construction method thereof
Europäisches Patentamt | 2020
|