Waterproof construction method for basement roof
The invention provides a basement roof waterproof construction method which comprises the following steps: after roof concrete reaches preset strength, a roof is cleaned immediately; the cleaned top plate base layer is coated with waterproof paint to form a waterproof paint layer; after the waterproof coating layer is dried, a waterproof roll is laid on the waterproof coating layer; laying a geotextile isolation layer on the waterproof coiled material; and after a protective layer is laid on the geotechnical cloth isolating layer, a reinforcing mesh is laid in the protective layer. According to the waterproof construction method for the basement roof, waterproof construction is conducted in the concrete construction stage of the basement roof, the cleaning difficulty of the roof can be effectively reduced, labor consumption caused by cleaning is greatly reduced, and cost is saved; the time for earthwork backfilling construction is also shortened, so that the construction period is shortened; compared with the prior art, mortar leveling layer construction is not needed, and the waterproof effect can be effectively prevented from being affected by the phenomena of cracking, loosening, dusting, peeling and the like of the mortar leveling layer.
本发明提供了一种地下室顶板防水施工方法,包括以下步骤:待顶板混凝土达到预设强度后,立即对所述顶板进行清理;在清理后的顶板基层上涂刷防水涂料形成防水涂料层;待所述防水涂料层干燥后,在其上铺设防水卷材;在所述防水卷材上铺设土工布隔离层;在土工布隔离层上铺设保护层后,并在所述保护层内铺设钢筋网片。本发明提供的地下室顶板防水施工方法,在地下室顶板混凝土施工阶段就进行防水施工,可有效降低顶板的清理难度,大大减少清理所造成的劳动力消耗,节省成本;也缩短了交给土方回填施工的时间,进而缩短工期;与现有技术相比,无需进行砂浆找平层施工,可以有效防止砂浆找平层出现裂缝、酥松、起砂和起皮现象等现象影响防水效果。
Waterproof construction method for basement roof
The invention provides a basement roof waterproof construction method which comprises the following steps: after roof concrete reaches preset strength, a roof is cleaned immediately; the cleaned top plate base layer is coated with waterproof paint to form a waterproof paint layer; after the waterproof coating layer is dried, a waterproof roll is laid on the waterproof coating layer; laying a geotextile isolation layer on the waterproof coiled material; and after a protective layer is laid on the geotechnical cloth isolating layer, a reinforcing mesh is laid in the protective layer. According to the waterproof construction method for the basement roof, waterproof construction is conducted in the concrete construction stage of the basement roof, the cleaning difficulty of the roof can be effectively reduced, labor consumption caused by cleaning is greatly reduced, and cost is saved; the time for earthwork backfilling construction is also shortened, so that the construction period is shortened; compared with the prior art, mortar leveling layer construction is not needed, and the waterproof effect can be effectively prevented from being affected by the phenomena of cracking, loosening, dusting, peeling and the like of the mortar leveling layer.
本发明提供了一种地下室顶板防水施工方法,包括以下步骤:待顶板混凝土达到预设强度后,立即对所述顶板进行清理;在清理后的顶板基层上涂刷防水涂料形成防水涂料层;待所述防水涂料层干燥后,在其上铺设防水卷材;在所述防水卷材上铺设土工布隔离层;在土工布隔离层上铺设保护层后,并在所述保护层内铺设钢筋网片。本发明提供的地下室顶板防水施工方法,在地下室顶板混凝土施工阶段就进行防水施工,可有效降低顶板的清理难度,大大减少清理所造成的劳动力消耗,节省成本;也缩短了交给土方回填施工的时间,进而缩短工期;与现有技术相比,无需进行砂浆找平层施工,可以有效防止砂浆找平层出现裂缝、酥松、起砂和起皮现象等现象影响防水效果。
Waterproof construction method for basement roof
一种地下室顶板防水施工方法
ZHAO YIN (Autor:in) / CAO YUE (Autor:in) / SONG WENTAO (Autor:in) / ZANG CHUANCONG (Autor:in) / ZHANG BOLU (Autor:in)
22.04.2022
Patent
Elektronische Ressource
Chinesisch
Waterproof construction method for roof, basement exterior wall and basement roof
Europäisches Patentamt | 2021
|Waterproof construction process and construction equipment for basement roof
Europäisches Patentamt | 2024
|Basement roof post-cast strip waterproof structure and construction method thereof
Europäisches Patentamt | 2022
|