Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Waterproof construction method for basement roof
The invention discloses a basement roof waterproof construction method, which specifically comprises the following steps: S1, base layer treatment: cleaning sundries on the surface of a basement roof, leveling protruding ash, laitance and the like, and keeping the constructed base layer clean and flat, and relates to the technical field of building construction. According to the waterproof construction method for the basement roof, through the operation steps from S1 to S3, the construction operation of waterproof construction is utilized, detection and repair operation is carried out between the laying operation of primary coiled material laying and the laying operation of secondary coiled material laying, continuous watering operation is carried out above the position, prone to water leakage, of the basement roof, and whether the water leakage problem exists or not is observed; and the problems are repaired in time, so that the problems can be found in advance for further treatment, the attractiveness of subsequent construction is not affected, and the waterproofness of the waterproof construction method for the basement roof is synchronously improved.
本发明公开了一种地下室顶板防水施工方法,具体包括以下步骤:S1、基层处理:将地下室顶板表面杂物清理干净,将凸出的灰渣、浮浆等铲平,保持施工的基层干净、平整,本发明涉及建筑施工技术领域。该地下室顶板防水施工方法,通过S1‑S3的操作步骤,利用防水施工的施工操作,而在进行一次卷材铺设和二次卷材铺设的铺设操作之间进行检测和修补操作,利用在地下室顶板的易漏水处上方进行连续的浇水操作,观测是否存在漏水问题,并且及时对问题进行修补处理,以此不仅能够提前的发现问题进行进一步的处理,而且不影响后续施工的美观性,同步的提高了该地下室顶板防水施工方法的防水性。
Waterproof construction method for basement roof
The invention discloses a basement roof waterproof construction method, which specifically comprises the following steps: S1, base layer treatment: cleaning sundries on the surface of a basement roof, leveling protruding ash, laitance and the like, and keeping the constructed base layer clean and flat, and relates to the technical field of building construction. According to the waterproof construction method for the basement roof, through the operation steps from S1 to S3, the construction operation of waterproof construction is utilized, detection and repair operation is carried out between the laying operation of primary coiled material laying and the laying operation of secondary coiled material laying, continuous watering operation is carried out above the position, prone to water leakage, of the basement roof, and whether the water leakage problem exists or not is observed; and the problems are repaired in time, so that the problems can be found in advance for further treatment, the attractiveness of subsequent construction is not affected, and the waterproofness of the waterproof construction method for the basement roof is synchronously improved.
本发明公开了一种地下室顶板防水施工方法,具体包括以下步骤:S1、基层处理:将地下室顶板表面杂物清理干净,将凸出的灰渣、浮浆等铲平,保持施工的基层干净、平整,本发明涉及建筑施工技术领域。该地下室顶板防水施工方法,通过S1‑S3的操作步骤,利用防水施工的施工操作,而在进行一次卷材铺设和二次卷材铺设的铺设操作之间进行检测和修补操作,利用在地下室顶板的易漏水处上方进行连续的浇水操作,观测是否存在漏水问题,并且及时对问题进行修补处理,以此不仅能够提前的发现问题进行进一步的处理,而且不影响后续施工的美观性,同步的提高了该地下室顶板防水施工方法的防水性。
Waterproof construction method for basement roof
一种地下室顶板防水施工方法
YAO JIANPING (Autor:in) / HUANG BIN (Autor:in) / YAO JUN (Autor:in) / SUN YAOHUA (Autor:in) / WU LIHUI (Autor:in) / FENG WEI (Autor:in)
03.11.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Waterproof construction method for roof, basement exterior wall and basement roof
Europäisches Patentamt | 2021
|Waterproof construction process and construction equipment for basement roof
Europäisches Patentamt | 2024
|