Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Cement building prefabricated part
The invention relates to the technical field of building components, in particular to a cement building prefabricated part. Comprising a wall body and a wall head, a first groove and a second groove are formed in the wall head. The clamping blocks are located in the first groove and the second groove in the initial state. A third groove is formed in the wall body; the length of the third groove in the transverse direction of the wall body is the same as the length of the clamping block in the transverse direction of the wall body. The wall body enters the first groove, one end of the clamping block is jacked up by the wall body, then the end, close to the first groove, of the clamping block enters the third groove to be matched with the end, close to the first groove, of the clamping block when the wall body completely enters the first groove, and the purpose of installing the wall head on the wall body is achieved; compared with the prior art, the wall top is more convenient to install, the time for installing the wall top is shortened, and the labor intensity of workers is relieved.
本发明涉及建筑构件技术领域,具体的说是一种水泥建筑预制件;包括墙体和墙头;所述墙头内设置有一号凹槽和二号凹槽;所述卡块在初始状态下位于一号凹槽和二号凹槽内;所述墙体上设置有三号凹槽;所述三号凹槽在墙体横向上的长度与卡块在墙体横向上的长度相同;本发明通过墙体进入一号凹槽内,墙体将卡块的一端顶起,再与墙体完全进入一号凹槽内时卡块靠近一号凹槽的一端进入三号凹槽内相配合,达到了将墙头安装在墙体上的目的,从而墙头通过一号凹槽卡在墙体上长期使用后不会发生倾斜,相比于现有技术本发明的墙头安装更为方便,减轻了工作人员安装墙头的时间和劳动强度。
Cement building prefabricated part
The invention relates to the technical field of building components, in particular to a cement building prefabricated part. Comprising a wall body and a wall head, a first groove and a second groove are formed in the wall head. The clamping blocks are located in the first groove and the second groove in the initial state. A third groove is formed in the wall body; the length of the third groove in the transverse direction of the wall body is the same as the length of the clamping block in the transverse direction of the wall body. The wall body enters the first groove, one end of the clamping block is jacked up by the wall body, then the end, close to the first groove, of the clamping block enters the third groove to be matched with the end, close to the first groove, of the clamping block when the wall body completely enters the first groove, and the purpose of installing the wall head on the wall body is achieved; compared with the prior art, the wall top is more convenient to install, the time for installing the wall top is shortened, and the labor intensity of workers is relieved.
本发明涉及建筑构件技术领域,具体的说是一种水泥建筑预制件;包括墙体和墙头;所述墙头内设置有一号凹槽和二号凹槽;所述卡块在初始状态下位于一号凹槽和二号凹槽内;所述墙体上设置有三号凹槽;所述三号凹槽在墙体横向上的长度与卡块在墙体横向上的长度相同;本发明通过墙体进入一号凹槽内,墙体将卡块的一端顶起,再与墙体完全进入一号凹槽内时卡块靠近一号凹槽的一端进入三号凹槽内相配合,达到了将墙头安装在墙体上的目的,从而墙头通过一号凹槽卡在墙体上长期使用后不会发生倾斜,相比于现有技术本发明的墙头安装更为方便,减轻了工作人员安装墙头的时间和劳动强度。
Cement building prefabricated part
一种水泥建筑预制件
DUAN YUSONG (Autor:in) / WANG JUN (Autor:in)
26.04.2022
Patent
Elektronische Ressource
Chinesisch
IPC:
E04C
STRUCTURAL ELEMENTS
,
Bauelemente
Europäisches Patentamt | 2022
|