Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Bridge and culvert abutment back hanging plate retaining type foam light soil backfill construction method
The invention relates to a bridge and culvert abutment back hanging plate retaining type foam light soil backfill construction method. The method comprises the steps that S1, construction preparation is conducted; debugging a prefabricated hanging plate and foam light soil mixing device, and verifying a test mix proportion; s2, an abutment back is processed, the bearing capacity is detected, test lofting is conducted, and a backfill area is determined; s3, hanging plate construction; hanging plates are arranged around the backfill area to prevent backfill materials in the backfill area from flowing out; s4, foam light soil is mixed, and the foam light soil is poured on the first layer of the backfill area; s5, preserving; s6, the steps S3-S5 are repeated, the next layer of hanging plate construction is conducted, and backfilling continues to be conducted till the backfilling height is reached; the method has the effect of reducing differential settlement in abutment back backfilling engineering.
本申请涉及一种桥涵台背挂板支档式泡沫轻质土回填施工工法,其包括S1:施工准备;预制挂板,泡沫轻质土拌合设备调试,试验配合比验证;S2:台背处理并检测承载力,测试放样,确定回填区域;S3:挂板施工;使用挂板围绕回填区域设置,阻挡回填区域的回填物外流;S4:拌合泡沫轻质土,并在回填区域一层浇筑泡沫轻质土;S5:养生;S6:重复S3~S5,转入下一层挂板施工并继续进行回填,直至达到回填高度;本申请具有减少台背回填工程中的不均匀沉降的效果。
Bridge and culvert abutment back hanging plate retaining type foam light soil backfill construction method
The invention relates to a bridge and culvert abutment back hanging plate retaining type foam light soil backfill construction method. The method comprises the steps that S1, construction preparation is conducted; debugging a prefabricated hanging plate and foam light soil mixing device, and verifying a test mix proportion; s2, an abutment back is processed, the bearing capacity is detected, test lofting is conducted, and a backfill area is determined; s3, hanging plate construction; hanging plates are arranged around the backfill area to prevent backfill materials in the backfill area from flowing out; s4, foam light soil is mixed, and the foam light soil is poured on the first layer of the backfill area; s5, preserving; s6, the steps S3-S5 are repeated, the next layer of hanging plate construction is conducted, and backfilling continues to be conducted till the backfilling height is reached; the method has the effect of reducing differential settlement in abutment back backfilling engineering.
本申请涉及一种桥涵台背挂板支档式泡沫轻质土回填施工工法,其包括S1:施工准备;预制挂板,泡沫轻质土拌合设备调试,试验配合比验证;S2:台背处理并检测承载力,测试放样,确定回填区域;S3:挂板施工;使用挂板围绕回填区域设置,阻挡回填区域的回填物外流;S4:拌合泡沫轻质土,并在回填区域一层浇筑泡沫轻质土;S5:养生;S6:重复S3~S5,转入下一层挂板施工并继续进行回填,直至达到回填高度;本申请具有减少台背回填工程中的不均匀沉降的效果。
Bridge and culvert abutment back hanging plate retaining type foam light soil backfill construction method
桥涵台背挂板支档式泡沫轻质土回填施工工法
JIA XUNTAO (Autor:in) / GENG YANRONG (Autor:in) / HAN JIAQI (Autor:in) / JIN HANG (Autor:in) / TIAN PENGBO (Autor:in) / LIU YOUHUI (Autor:in) / WANG LE (Autor:in) / ZHANG XIAOHU (Autor:in) / SUN JIE (Autor:in) / ZHANG LEI (Autor:in)
06.05.2022
Patent
Elektronische Ressource
Chinesisch
Backfill construction method for abutment back of flow-state solidified soil bridge and culvert
Europäisches Patentamt | 2023
|Bridge abutment back backfill pouring method and novel assembly type retaining wall
Europäisches Patentamt | 2022
|Bridge abutment back backfill roadbed and construction method thereof
Europäisches Patentamt | 2023
|Construction method for backfilling abutment back of light foam concrete bridge abutment
Europäisches Patentamt | 2023
|Post-construction abutment back backfill compaction method
Europäisches Patentamt | 2023
|