Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Assembled integral type reinforced concrete slab bridge structure and construction method thereof
The invention discloses an assembled integral type reinforced concrete slab bridge structure and a construction method thereof.The assembled integral type reinforced concrete slab bridge structure comprises a concrete plate layer, a reinforcing steel bar cage is fixedly embedded in the concrete plate layer and comprises longitudinal steel bars and transverse connecting rings, the surfaces of the longitudinal steel bars are bent to form bent parts, and the transverse connecting rings are connected with the longitudinal steel bars; combined connecting parts are formed on the surfaces of the two sides of the bent part respectively, the surfaces of the transverse connecting rings are fixedly connected to the surfaces of one sides of the combined connecting parts, reinforcing connecting steel bars are fixedly connected to the surfaces of one sides of the transverse connecting rings, and a connecting cylinder is fixedly embedded in the surface of one side of the concrete plate layer. The structural strength is guaranteed by embedding the reinforcing steel bar cage into the concrete plate layer, meanwhile, the longitudinal steel bars are bent to form different bent parts and combined connecting parts, and the connecting cylinders are embedded into the surfaces, so that hoisting and transferring are facilitated after forming, the use convenience and stability can be greatly improved, the safety and high efficiency of construction are guaranteed, and the construction cost is reduced. The popularization is convenient.
本发明公开了一种装配整体式钢筋混凝土板桥结构及其构建方法,包括混凝土板块层,所述混凝土板块层的内部固定镶嵌有加固钢筋笼,所述加固钢筋笼包括纵向钢筋和横向连接环,所述纵向钢筋的表面弯折形成有弯折部,所述弯折部的两侧表面分别形成有组合连接部,所述横向连接环的表面固定连接于组合连接部的一侧表面,所述横向连接环的一侧表面固定连接有加固连接钢筋,所述混凝土板块层的一侧表面固定镶嵌有连接筒,通过在混凝土板块层内部内嵌加固钢筋笼来保证结构强度,同时通过纵向钢筋弯折来形成不同的弯折部和组合连接部,并且通过表面内嵌连接筒,成型后利于起吊转运,这样能够大大提高使用的便利性和稳定性,保证构建的安全高效性,方便推广。
Assembled integral type reinforced concrete slab bridge structure and construction method thereof
The invention discloses an assembled integral type reinforced concrete slab bridge structure and a construction method thereof.The assembled integral type reinforced concrete slab bridge structure comprises a concrete plate layer, a reinforcing steel bar cage is fixedly embedded in the concrete plate layer and comprises longitudinal steel bars and transverse connecting rings, the surfaces of the longitudinal steel bars are bent to form bent parts, and the transverse connecting rings are connected with the longitudinal steel bars; combined connecting parts are formed on the surfaces of the two sides of the bent part respectively, the surfaces of the transverse connecting rings are fixedly connected to the surfaces of one sides of the combined connecting parts, reinforcing connecting steel bars are fixedly connected to the surfaces of one sides of the transverse connecting rings, and a connecting cylinder is fixedly embedded in the surface of one side of the concrete plate layer. The structural strength is guaranteed by embedding the reinforcing steel bar cage into the concrete plate layer, meanwhile, the longitudinal steel bars are bent to form different bent parts and combined connecting parts, and the connecting cylinders are embedded into the surfaces, so that hoisting and transferring are facilitated after forming, the use convenience and stability can be greatly improved, the safety and high efficiency of construction are guaranteed, and the construction cost is reduced. The popularization is convenient.
本发明公开了一种装配整体式钢筋混凝土板桥结构及其构建方法,包括混凝土板块层,所述混凝土板块层的内部固定镶嵌有加固钢筋笼,所述加固钢筋笼包括纵向钢筋和横向连接环,所述纵向钢筋的表面弯折形成有弯折部,所述弯折部的两侧表面分别形成有组合连接部,所述横向连接环的表面固定连接于组合连接部的一侧表面,所述横向连接环的一侧表面固定连接有加固连接钢筋,所述混凝土板块层的一侧表面固定镶嵌有连接筒,通过在混凝土板块层内部内嵌加固钢筋笼来保证结构强度,同时通过纵向钢筋弯折来形成不同的弯折部和组合连接部,并且通过表面内嵌连接筒,成型后利于起吊转运,这样能够大大提高使用的便利性和稳定性,保证构建的安全高效性,方便推广。
Assembled integral type reinforced concrete slab bridge structure and construction method thereof
一种装配整体式钢筋混凝土板桥结构及其构建方法
13.05.2022
Patent
Elektronische Ressource
Chinesisch
Construction method of assembled integral hollow slab bridge
Europäisches Patentamt | 2021
|Europäisches Patentamt | 2015
|Assembled integral flat slab and construction method thereof
Europäisches Patentamt | 2021
|Europäisches Patentamt | 2021
|