Separation joint preposition method construction device
The invention discloses a construction device adopting a separation seam preposition method. Comprising a glue storage barrel with a downward opening, a connecting shaft sleeve arranged at one end of the glue storage barrel, a glue dripping barrel connected with the connecting shaft sleeve, a check ring arranged at the front end of the glue storage barrel, a connecting assembly arranged between the glue dripping barrel and the connecting shaft sleeve, and a push block arranged in the glue storage barrel, the push rod is connected with the push block, the adjusting assembly is used for adjusting the push rod, and the connecting shaft sleeve is detachably connected with the glue storage barrel. According to the construction device adopting the separation joint front-loading method, the connecting shaft sleeve and the glue storage barrel are detachably connected with each other, so that a glue stick is conveniently placed in the glue storage barrel, the push rod is adjusted through the adjusting assembly, a separation joint gap needing to be filled with the glue stick is conveniently filled with the glue stick through the push block, and a glue surface is leveled through the check ring.
本发明公开了一种分隔缝前置法施工装置,包括开口朝下的储胶筒、设置在所述储胶筒一端的连接轴套、与所述连接轴套相连接的滴胶筒、设置在所述储胶筒前端的挡圈、设置在所述滴胶筒与连接轴套之间的连接组件、设置在所述储胶筒内的推块、与所述推块相连接的推杆以及用于对推杆进行调节的调节组件,所述连接轴套与储胶筒可拆卸连接。本发明一种分隔缝前置法施工装置由于将连接轴套和储胶筒相互可拆卸连接,从而便于将胶棒放置在储胶筒内,并通过调节组件对推杆进行调节,进而便于通过推块将胶棒填充在需要补填的分隔缝间隙内,并通过挡圈对胶面进行整平。
Separation joint preposition method construction device
The invention discloses a construction device adopting a separation seam preposition method. Comprising a glue storage barrel with a downward opening, a connecting shaft sleeve arranged at one end of the glue storage barrel, a glue dripping barrel connected with the connecting shaft sleeve, a check ring arranged at the front end of the glue storage barrel, a connecting assembly arranged between the glue dripping barrel and the connecting shaft sleeve, and a push block arranged in the glue storage barrel, the push rod is connected with the push block, the adjusting assembly is used for adjusting the push rod, and the connecting shaft sleeve is detachably connected with the glue storage barrel. According to the construction device adopting the separation joint front-loading method, the connecting shaft sleeve and the glue storage barrel are detachably connected with each other, so that a glue stick is conveniently placed in the glue storage barrel, the push rod is adjusted through the adjusting assembly, a separation joint gap needing to be filled with the glue stick is conveniently filled with the glue stick through the push block, and a glue surface is leveled through the check ring.
本发明公开了一种分隔缝前置法施工装置,包括开口朝下的储胶筒、设置在所述储胶筒一端的连接轴套、与所述连接轴套相连接的滴胶筒、设置在所述储胶筒前端的挡圈、设置在所述滴胶筒与连接轴套之间的连接组件、设置在所述储胶筒内的推块、与所述推块相连接的推杆以及用于对推杆进行调节的调节组件,所述连接轴套与储胶筒可拆卸连接。本发明一种分隔缝前置法施工装置由于将连接轴套和储胶筒相互可拆卸连接,从而便于将胶棒放置在储胶筒内,并通过调节组件对推杆进行调节,进而便于通过推块将胶棒填充在需要补填的分隔缝间隙内,并通过挡圈对胶面进行整平。
Separation joint preposition method construction device
一种分隔缝前置法施工装置
JIANG TAO (Autor:in) / LI WANWANG (Autor:in) / YU QINGSONG (Autor:in) / CHEN MING (Autor:in) / ZHAO JUNMING (Autor:in)
13.05.2022
Patent
Elektronische Ressource
Chinesisch
IPC:
E04F
FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
,
Ausbau von Bauwerken, z.B. Treppen, Fußböden
Preposition flow regulation type direct connection water supply device
Europäisches Patentamt | 2015
Separation joint reservation control device and construction method
Europäisches Patentamt | 2023
|Constructional engineering roof layer separation joint reserving device and construction method
Europäisches Patentamt | 2023
|High-applicability concrete construction joint bamboo joint air bag and separation method
Europäisches Patentamt | 2024
|Concrete separation joint pre-embedded separation fixing assembly and construction method thereof
Europäisches Patentamt | 2024
|