Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Separation joint reservation control device and construction method
The invention relates to the technical field of separation seams, in particular to a separation seam reservation control device which comprises a frame column and a frame suite, the outer wall of the frame column is sleeved with the inner wall of the frame suite, and sliding rails are symmetrically arranged on the side, opposite to an opening, of the frame suite about the vertical center line of the frame suite. According to the device, the vertical adjusting mechanism drives the separation seam filling transverse frame to move downwards, then the separation seam filling transverse frame can separate poured concrete, and when separation seams are formed after separation, the transverse strip sliding blocks are connected to the two sliding rails in a sliding mode, and a truss girder is connected to one side of each transverse strip sliding block. Then the displacement filling mechanism is moved to the separation seam through the up-down adjusting mechanism, and then the separation seam can be sequentially filled through a foamed plastic strip guide wheel, a sealant exporting device, a paint flow guiding piece and an aluminum foil waterproof adhesive tape roller guide piece; in this way, the partition seam filling transverse frame is taken out of the concrete, meanwhile, the partition seam is efficiently filled, and therefore the construction period can be effectively shortened.
本发明涉及分隔缝技术领域,涉及一种分隔缝预留控制装置,包括框架柱和框架套件,所述框架柱的外壁与框架套件的内壁相套合,所述框架套件位于开口对立的一侧关于其竖向中心线对称设置有滑轨,且两个所述滑轨内滑动连接有横条滑块,所述横条滑块的一侧连接有桁架梁,该装置通过上下调节机构驱动分隔缝填充横架下移,然后分隔缝填充横架能够对浇筑的混凝土进行分隔,而分隔后形成分隔缝时,再次通过上下调节机构将位移填充机构移动到分隔缝处,然后通过泡沫塑料条导轮、密封膏导出器、油漆导流件和铝箔防水胶带滚轮导件能够依次对分隔缝进行填充工作,这样分隔缝填充横架从混凝土中取出的同时将分隔缝高效地进行填充,从而能够有效地缩短工期。
Separation joint reservation control device and construction method
The invention relates to the technical field of separation seams, in particular to a separation seam reservation control device which comprises a frame column and a frame suite, the outer wall of the frame column is sleeved with the inner wall of the frame suite, and sliding rails are symmetrically arranged on the side, opposite to an opening, of the frame suite about the vertical center line of the frame suite. According to the device, the vertical adjusting mechanism drives the separation seam filling transverse frame to move downwards, then the separation seam filling transverse frame can separate poured concrete, and when separation seams are formed after separation, the transverse strip sliding blocks are connected to the two sliding rails in a sliding mode, and a truss girder is connected to one side of each transverse strip sliding block. Then the displacement filling mechanism is moved to the separation seam through the up-down adjusting mechanism, and then the separation seam can be sequentially filled through a foamed plastic strip guide wheel, a sealant exporting device, a paint flow guiding piece and an aluminum foil waterproof adhesive tape roller guide piece; in this way, the partition seam filling transverse frame is taken out of the concrete, meanwhile, the partition seam is efficiently filled, and therefore the construction period can be effectively shortened.
本发明涉及分隔缝技术领域,涉及一种分隔缝预留控制装置,包括框架柱和框架套件,所述框架柱的外壁与框架套件的内壁相套合,所述框架套件位于开口对立的一侧关于其竖向中心线对称设置有滑轨,且两个所述滑轨内滑动连接有横条滑块,所述横条滑块的一侧连接有桁架梁,该装置通过上下调节机构驱动分隔缝填充横架下移,然后分隔缝填充横架能够对浇筑的混凝土进行分隔,而分隔后形成分隔缝时,再次通过上下调节机构将位移填充机构移动到分隔缝处,然后通过泡沫塑料条导轮、密封膏导出器、油漆导流件和铝箔防水胶带滚轮导件能够依次对分隔缝进行填充工作,这样分隔缝填充横架从混凝土中取出的同时将分隔缝高效地进行填充,从而能够有效地缩短工期。
Separation joint reservation control device and construction method
一种分隔缝预留控制装置及施工方法
LIU XIAOYONG (Autor:in) / ZHANG MENG (Autor:in) / GAO BINGQIANG (Autor:in) / WU XUEWEN (Autor:in) / GONG JIANKANG (Autor:in) / YANG XIAOBEN (Autor:in) / GAO TAIPING (Autor:in) / NIE QIANG (Autor:in)
14.03.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Separation joint preposition method construction device
Europäisches Patentamt | 2022
|Hole reservation plugging device for construction engineering
Europäisches Patentamt | 2020
|Bare concrete structure reservation and pre-embedding device and construction method
Europäisches Patentamt | 2021
|Constructional engineering roof layer separation joint reserving device and construction method
Europäisches Patentamt | 2023
|