Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Four-vehicle marshalling intercity railway underground station structure
The embodiment of the invention discloses a four-vehicle marshalling intercity railway underground station structure which comprises a first underground layer, a second underground layer and a third underground layer, the first underground layer comprises a comprehensive development area and a first facility comprehensive area, and the two sides of the comprehensive development area are connected with the ground through first channels; the second underground layer comprises a second facility comprehensive area and a functional area; the third underground layer comprises a platform area and a rail-mounted area, and the rail-mounted area comprises a shield well connected with the shield area and a tunnel fan room at the bottom of the shield well; the second underground layer is connected with the first underground layer and the third underground layer through a second channel. According to the design scheme, a station tunnel air system and an air supply and exhaust system are greatly optimized, the requirements of surrounding plot construction are met in many aspects, the construction cost can be reduced, the ground environment can be optimized, and ground noise sources are reduced.
本发明实施例公开了一种4辆编组城际铁路地下车站结构,其包括地下一层、地下二层及地下三层,地下一层包括综合开发区及第一设施综合区,综合开发区的两侧通过第一通道连接地面;地下二层包括第二设施综合区及功能区;地下三层包括站台区及轨行区,轨行区包括连接盾构区间的盾构井与盾构井底部的隧道风机房;地下二层通过第二通道连接地下一层及地下三层。本设计方案对车站隧道风系统、送排风系统进行了大幅度优化,并在很多方面兼顾了周边地块建设的需求,可降低建造成本,优化地面环境,减少地面噪音源。
Four-vehicle marshalling intercity railway underground station structure
The embodiment of the invention discloses a four-vehicle marshalling intercity railway underground station structure which comprises a first underground layer, a second underground layer and a third underground layer, the first underground layer comprises a comprehensive development area and a first facility comprehensive area, and the two sides of the comprehensive development area are connected with the ground through first channels; the second underground layer comprises a second facility comprehensive area and a functional area; the third underground layer comprises a platform area and a rail-mounted area, and the rail-mounted area comprises a shield well connected with the shield area and a tunnel fan room at the bottom of the shield well; the second underground layer is connected with the first underground layer and the third underground layer through a second channel. According to the design scheme, a station tunnel air system and an air supply and exhaust system are greatly optimized, the requirements of surrounding plot construction are met in many aspects, the construction cost can be reduced, the ground environment can be optimized, and ground noise sources are reduced.
本发明实施例公开了一种4辆编组城际铁路地下车站结构,其包括地下一层、地下二层及地下三层,地下一层包括综合开发区及第一设施综合区,综合开发区的两侧通过第一通道连接地面;地下二层包括第二设施综合区及功能区;地下三层包括站台区及轨行区,轨行区包括连接盾构区间的盾构井与盾构井底部的隧道风机房;地下二层通过第二通道连接地下一层及地下三层。本设计方案对车站隧道风系统、送排风系统进行了大幅度优化,并在很多方面兼顾了周边地块建设的需求,可降低建造成本,优化地面环境,减少地面噪音源。
Four-vehicle marshalling intercity railway underground station structure
一种4辆编组城际铁路地下车站结构
YIN WENHUA (Autor:in) / SHU JUNFENG (Autor:in) / LU XIAOLIN (Autor:in) / KANG YUEHUA (Autor:in) / LIU XIANAN (Autor:in) / LIU CHEN (Autor:in) / CHEN CAIDUI (Autor:in) / WEI GANGFU (Autor:in) / ZHOU HANG (Autor:in) / DENG JIAN (Autor:in)
03.06.2022
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
/
E04F
FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
,
Ausbau von Bauwerken, z.B. Treppen, Fußböden
/
E21D
SHAFTS
,
Schächte
/
E21F
Sicherheitsvorrichtungen, Förderung, Auffüllen oder Bergversatz, Rettungswesen, Bewetterung oder Entwässerung in oder von Gruben oder Tunnels
,
SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINAGE IN OR OF MINES OR TUNNELS
Construction method of cable-stayed bridge crossing multi-track railway marshalling station
Europäisches Patentamt | 2024
|Innovations on Bejing-Tianjin Intercity Railway
IuD Bahn | 2009
|Analysis on Influence of Shield Tunnel Crossing under Intercity High-Speed Railway Station
Trans Tech Publications | 2011
|