Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Prefabricated and assembled post-pouring type framework slope protection structure for railway slope and construction method thereof
The invention relates to a railway slope prefabricated assembly post-pouring type framework slope protection structure and a construction method thereof, and belongs to the field of railway slope engineering protection.The railway slope prefabricated assembly post-pouring type framework slope protection structure comprises a base fixedly connected to the bottom of a slope, multiple sets of prefabricated slope protection mechanisms are laid on the slope surface of the slope, and the prefabricated slope protection mechanisms are prefabricated through concrete; the lower end of the prefabricated slope protection mechanism abuts against the base. The construction method has the effects that the construction difficulty is reduced, and the construction efficiency of the railway slope protection structure is improved.
本申请涉及一种铁路边坡预制拼装后浇式骨架护坡结构及其施工方法,属于铁路边坡工程防护的领域,其包括固定连接于边坡底部的底座,所述边坡坡面上铺设有多组预制护坡机构,所述预制护坡机构为混凝土预制而成,所述预制护坡机构下端与底座抵接。本申请具有降低施工难度,提高铁路边坡护坡结构施工效率的效果。
Prefabricated and assembled post-pouring type framework slope protection structure for railway slope and construction method thereof
The invention relates to a railway slope prefabricated assembly post-pouring type framework slope protection structure and a construction method thereof, and belongs to the field of railway slope engineering protection.The railway slope prefabricated assembly post-pouring type framework slope protection structure comprises a base fixedly connected to the bottom of a slope, multiple sets of prefabricated slope protection mechanisms are laid on the slope surface of the slope, and the prefabricated slope protection mechanisms are prefabricated through concrete; the lower end of the prefabricated slope protection mechanism abuts against the base. The construction method has the effects that the construction difficulty is reduced, and the construction efficiency of the railway slope protection structure is improved.
本申请涉及一种铁路边坡预制拼装后浇式骨架护坡结构及其施工方法,属于铁路边坡工程防护的领域,其包括固定连接于边坡底部的底座,所述边坡坡面上铺设有多组预制护坡机构,所述预制护坡机构为混凝土预制而成,所述预制护坡机构下端与底座抵接。本申请具有降低施工难度,提高铁路边坡护坡结构施工效率的效果。
Prefabricated and assembled post-pouring type framework slope protection structure for railway slope and construction method thereof
一种铁路边坡预制拼装后浇式骨架护坡结构及其施工方法
XUE YONGSHENG (Autor:in) / PANG JINGDONG (Autor:in) / CHEN YINGFEI (Autor:in) / HAO GUANGLIANG (Autor:in) / XU JIANLAI (Autor:in) / WEI XUEHAN (Autor:in) / MA PENGFEI (Autor:in) / LIU SHUAI (Autor:in) / GUO ZHONGHUA (Autor:in)
10.06.2022
Patent
Elektronische Ressource
Chinesisch
Europäisches Patentamt | 2020
|Constraint type prefabricated assembled side slope protection system and construction method
Europäisches Patentamt | 2023
|Prefabricated slope protection and construction method thereof
Europäisches Patentamt | 2023
|Prefabricated ecological protection slope and construction method thereof
Europäisches Patentamt | 2022
|Side slope pouring construction process and slope pouring material
Europäisches Patentamt | 2021
|