Rapidly erected movable bottom-supported port
The invention relates to the combination of the technical field of port engineering construction and the field of ocean engineering manufacturing, and discloses a movable bottom-supported port capable of being quickly erected. The problems that an existing port is long in construction period, serious in environmental damage, difficult to reuse, poor in economical efficiency and the like are solved. The port comprises core assemblies such as a port body, a fixing device, a berthing facility, a trestle and a trestle erecting device, and auxiliary assemblies such as an electric power device, a propelling device and a cargo lightering device. The trestle can be integrally prefabricated in a factory in advance, after the trestle is conveyed to a designated water area, bottom-sitting operation is completed, necessary stabilizing measures are deployed, the trestle is stretched, and then port construction can be completed. And by combining a trestle system capable of being quickly erected, the port is connected with a land base, so that the purpose of quickly constructing the port with the trestle is achieved. And after the service is completed, the port and the trestle can be integrally withdrawn and moved to other positions to be repeatedly deployed and reused.
本发明涉及港口工程施工技术领域和海洋工程制造领域的结合,其公开了一种快速架设的可移动坐底式港口。解决了目前港口建造周期长,环境破坏严重,难以重复利用,经济性较差等问题。本发明包括港口本体、固定装置、靠泊设施、栈桥和栈桥架设装置等核心组件,以及电力装置、推进装置、货物驳运装置等附属组件。本发明可提前在工厂整体预制,运送到指定水域后,完成坐底操作和部署必要的稳固措施,伸展栈桥,即可完成港口建设。结合可快速架设的栈桥系统,实现港口与陆基连接,从而实现带栈桥港口快速建设的目的。并且在服役完成后,港口和栈桥可以整体撤收,移动到其它位置重复部署再利用。
Rapidly erected movable bottom-supported port
The invention relates to the combination of the technical field of port engineering construction and the field of ocean engineering manufacturing, and discloses a movable bottom-supported port capable of being quickly erected. The problems that an existing port is long in construction period, serious in environmental damage, difficult to reuse, poor in economical efficiency and the like are solved. The port comprises core assemblies such as a port body, a fixing device, a berthing facility, a trestle and a trestle erecting device, and auxiliary assemblies such as an electric power device, a propelling device and a cargo lightering device. The trestle can be integrally prefabricated in a factory in advance, after the trestle is conveyed to a designated water area, bottom-sitting operation is completed, necessary stabilizing measures are deployed, the trestle is stretched, and then port construction can be completed. And by combining a trestle system capable of being quickly erected, the port is connected with a land base, so that the purpose of quickly constructing the port with the trestle is achieved. And after the service is completed, the port and the trestle can be integrally withdrawn and moved to other positions to be repeatedly deployed and reused.
本发明涉及港口工程施工技术领域和海洋工程制造领域的结合,其公开了一种快速架设的可移动坐底式港口。解决了目前港口建造周期长,环境破坏严重,难以重复利用,经济性较差等问题。本发明包括港口本体、固定装置、靠泊设施、栈桥和栈桥架设装置等核心组件,以及电力装置、推进装置、货物驳运装置等附属组件。本发明可提前在工厂整体预制,运送到指定水域后,完成坐底操作和部署必要的稳固措施,伸展栈桥,即可完成港口建设。结合可快速架设的栈桥系统,实现港口与陆基连接,从而实现带栈桥港口快速建设的目的。并且在服役完成后,港口和栈桥可以整体撤收,移动到其它位置重复部署再利用。
Rapidly erected movable bottom-supported port
一种快速架设的可移动坐底式港口
ZHANG MI (Autor:in) / XIANG YI (Autor:in) / GAO HANG (Autor:in) / YAO JIANGANG (Autor:in) / PAN TIANJIA (Autor:in)
14.06.2022
Patent
Elektronische Ressource
Chinesisch