Maintenance method for fabricated anti-sedimentation well lid of urban road
The invention belongs to the field of municipal engineering, and particularly relates to an urban road assembly type anti-sedimentation well lid maintenance method which comprises the steps that a surface layer around an old well lid is cut through a cutting machine; chiseling away the old well lid; the assembly type anti-sedimentation well lid is placed and leveled; formwork erecting is conducted along the inner side of the shaft; pouring concrete; milling and lofting; emulsified asphalt and an interface agent are brushed; paving an asphalt surface layer and rolling; and opening traffic. According to the process, the workload of a construction site is reduced, the construction time is shortened, traffic can be recovered within a short time after construction, one hour is needed for completing lifting of one set of assembly type well lid, and compared with a traditional well lid lifting process, the efficiency is higher.
本发明属于市政工程领域,具体涉及一种城镇道路装配式防沉降井盖养护方法,包括通过切割机对旧井盖的周围的面层进行切割;凿除旧井盖;放置装配式防沉降井盖,进行调平;沿井筒内侧进行支模;浇筑混凝土;铣刨放样;涂刷乳化沥青和界面剂;摊铺沥青面层并碾压;开放交通。本发明的工艺减少了施工现场作业量,缩短施工时间,施工后可在较短时间内恢复交通,完成一套装配式井盖提升需一小时,相较传统井盖提升工艺效率更高。
Maintenance method for fabricated anti-sedimentation well lid of urban road
The invention belongs to the field of municipal engineering, and particularly relates to an urban road assembly type anti-sedimentation well lid maintenance method which comprises the steps that a surface layer around an old well lid is cut through a cutting machine; chiseling away the old well lid; the assembly type anti-sedimentation well lid is placed and leveled; formwork erecting is conducted along the inner side of the shaft; pouring concrete; milling and lofting; emulsified asphalt and an interface agent are brushed; paving an asphalt surface layer and rolling; and opening traffic. According to the process, the workload of a construction site is reduced, the construction time is shortened, traffic can be recovered within a short time after construction, one hour is needed for completing lifting of one set of assembly type well lid, and compared with a traditional well lid lifting process, the efficiency is higher.
本发明属于市政工程领域,具体涉及一种城镇道路装配式防沉降井盖养护方法,包括通过切割机对旧井盖的周围的面层进行切割;凿除旧井盖;放置装配式防沉降井盖,进行调平;沿井筒内侧进行支模;浇筑混凝土;铣刨放样;涂刷乳化沥青和界面剂;摊铺沥青面层并碾压;开放交通。本发明的工艺减少了施工现场作业量,缩短施工时间,施工后可在较短时间内恢复交通,完成一套装配式井盖提升需一小时,相较传统井盖提升工艺效率更高。
Maintenance method for fabricated anti-sedimentation well lid of urban road
一种城镇道路装配式防沉降井盖养护方法
XIE WEI (Autor:in) / YAN HONG (Autor:in) / YU YIBO (Autor:in) / SHANG XIAOJIE (Autor:in) / XU DELING (Autor:in) / HAN JUN (Autor:in) / YE FANGCHU (Autor:in) / WANG CUNZHI (Autor:in) / WU BIN (Autor:in) / XU TIEZHU (Autor:in)
14.06.2022
Patent
Elektronische Ressource
Chinesisch
Anti-sedimentation inspection well for municipal road
Europäisches Patentamt | 2021
|Steel-concrete composite anti-sedimentation fabricated well lid and construction method
Europäisches Patentamt | 2023
|Municipal road inspection well anti-sedimentation structure and construction method
Europäisches Patentamt | 2024
|Installation method for anti-sedimentation well lid of newly-built road
Europäisches Patentamt | 2021
|Europäisches Patentamt | 2024
|