Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
The invention relates to the technical field of floor slabs, and discloses a steel structure floor slab reconstruction node which comprises an original floor slab, a newly-added floor slab is arranged on the right side of the original floor slab, a connecting device is arranged between the original floor slab and the newly-added floor slab, a fixing device is arranged at the upper end of the connecting device, and two studs are arranged on the surface of the original floor slab. The original floor slab and the newly-added floor slab are connected through the connecting groove, after the extension plate is clamped into the bottom of the original floor slab, the original floor slab and the newly-added floor slab can be connected with the assistance of the studs, and the connecting quality of the original floor slab and the newly-added floor slab is guaranteed; and after the fixing frame is clamped into the first open groove, the surface of the inserting block makes contact with the inner wall of the sliding groove, the fixing frame can be prevented from being disengaged from the sliding groove through the inclined arrangement at the left end of the sliding groove, and connection between the original floor and the newly-added floor can be effectively assisted.
本发明涉及楼板技术领域,且公开了一种钢结构楼板改造节点,包括原始楼板,所述原始楼板右侧设置有新增楼板,所述原始楼板与新增楼板之间设置有连接装置,所述连接装置上端设置有固定装置,所述原始楼板表面设置有两个栓钉,本发明通过将原始楼板和新增楼板之间通过连接槽进行连接,使延伸板卡入原始楼板底部后,即可通过栓钉辅助将原始楼板和新增楼板之间进行连接,保证原始楼板和新增楼板的连接质量,通过向开槽一内部卡入固定架后使插块表面与滑槽内壁接触,即可通过滑槽左端设置的倾斜状设置避免固定架脱离滑槽,可以有效的辅助原始楼板和新增楼板之间进行连接。
The invention relates to the technical field of floor slabs, and discloses a steel structure floor slab reconstruction node which comprises an original floor slab, a newly-added floor slab is arranged on the right side of the original floor slab, a connecting device is arranged between the original floor slab and the newly-added floor slab, a fixing device is arranged at the upper end of the connecting device, and two studs are arranged on the surface of the original floor slab. The original floor slab and the newly-added floor slab are connected through the connecting groove, after the extension plate is clamped into the bottom of the original floor slab, the original floor slab and the newly-added floor slab can be connected with the assistance of the studs, and the connecting quality of the original floor slab and the newly-added floor slab is guaranteed; and after the fixing frame is clamped into the first open groove, the surface of the inserting block makes contact with the inner wall of the sliding groove, the fixing frame can be prevented from being disengaged from the sliding groove through the inclined arrangement at the left end of the sliding groove, and connection between the original floor and the newly-added floor can be effectively assisted.
本发明涉及楼板技术领域,且公开了一种钢结构楼板改造节点,包括原始楼板,所述原始楼板右侧设置有新增楼板,所述原始楼板与新增楼板之间设置有连接装置,所述连接装置上端设置有固定装置,所述原始楼板表面设置有两个栓钉,本发明通过将原始楼板和新增楼板之间通过连接槽进行连接,使延伸板卡入原始楼板底部后,即可通过栓钉辅助将原始楼板和新增楼板之间进行连接,保证原始楼板和新增楼板的连接质量,通过向开槽一内部卡入固定架后使插块表面与滑槽内壁接触,即可通过滑槽左端设置的倾斜状设置避免固定架脱离滑槽,可以有效的辅助原始楼板和新增楼板之间进行连接。
Steel structure floor reconstruction node
一种钢结构楼板改造节点
ZENG BO (Autor:in)
14.06.2022
Patent
Elektronische Ressource
Chinesisch
Steel structure concrete floor deformation joint node structure
Europäisches Patentamt | 2023
|Europäisches Patentamt | 2021
|Non-anchor construction method for light steel structure floor adding reconstruction
Europäisches Patentamt | 2015
|