Construction method of subway shield tunnel underneath passing viaduct tunnel
The invention discloses a construction method of a subway shield tunnel underneath passing through a viaduct tunnel. The construction method comprises the following steps: 1) mathematical simulation analysis and three-dimensional modeling analysis; (2) construction parameters are formulated; (3) drilling a cast-in-place pile; (4) sleeve valve pipe grouting; 5) real-time monitoring; (6) tunnel segments are additionally installed; (7) reinforcing tunnel segments; and 8) sealing. The invention belongs to the technical field of viaduct shield tunnel construction, and particularly relates to a construction method for a subway shield tunnel to underpass a viaduct tunnel, which comprises the following steps of: analyzing and optimizing engineering design and a construction scheme, formulating an engineering control standard, taking pre-reinforcement measures on the subway tunnel and optimizing shield tunneling parameters; the construction control measures of skylight period crossing, strict control of tunneling parameters, strict control of unearthing amount, reinforced grouting and remote real-time monitoring are adopted, the deformation control theory of stress compensation and active underpinning of strata is adopted, the construction mode of skylight point construction is implemented, and tunnel pre-reinforcement treatment of segmented construction, single-line sequential crossing and skylight point construction modes is adopted.
本发明公开了一种地铁盾构隧道下穿高架桥隧道施工工法,包括如下步骤:1)数学模拟分析和三维建模分析;2)制定施工参数;3)钻孔灌注桩;4)袖阀管注浆;5)实时监测;6)加装隧道管片;7)隧道管片加固;8)密封。本发明属于高架桥盾构隧道施工技术领域,具体是一种地铁盾构隧道下穿高架桥隧道施工工法,通过分析优化工程设计和施工方案,制定工程控制标准,对地铁隧道采取预加固措施,优化盾构掘进参数,采取天窗期穿越、严控掘进参数、严控出土量、强化注浆、远程实时监测的施工控制措施,采用“应力补偿、主动托换地层”的变形控制理论和实行天窗点施工的施工方式,采用分段施工、单线依次穿越、天窗点施工模式的隧道预加固处理。
Construction method of subway shield tunnel underneath passing viaduct tunnel
The invention discloses a construction method of a subway shield tunnel underneath passing through a viaduct tunnel. The construction method comprises the following steps: 1) mathematical simulation analysis and three-dimensional modeling analysis; (2) construction parameters are formulated; (3) drilling a cast-in-place pile; (4) sleeve valve pipe grouting; 5) real-time monitoring; (6) tunnel segments are additionally installed; (7) reinforcing tunnel segments; and 8) sealing. The invention belongs to the technical field of viaduct shield tunnel construction, and particularly relates to a construction method for a subway shield tunnel to underpass a viaduct tunnel, which comprises the following steps of: analyzing and optimizing engineering design and a construction scheme, formulating an engineering control standard, taking pre-reinforcement measures on the subway tunnel and optimizing shield tunneling parameters; the construction control measures of skylight period crossing, strict control of tunneling parameters, strict control of unearthing amount, reinforced grouting and remote real-time monitoring are adopted, the deformation control theory of stress compensation and active underpinning of strata is adopted, the construction mode of skylight point construction is implemented, and tunnel pre-reinforcement treatment of segmented construction, single-line sequential crossing and skylight point construction modes is adopted.
本发明公开了一种地铁盾构隧道下穿高架桥隧道施工工法,包括如下步骤:1)数学模拟分析和三维建模分析;2)制定施工参数;3)钻孔灌注桩;4)袖阀管注浆;5)实时监测;6)加装隧道管片;7)隧道管片加固;8)密封。本发明属于高架桥盾构隧道施工技术领域,具体是一种地铁盾构隧道下穿高架桥隧道施工工法,通过分析优化工程设计和施工方案,制定工程控制标准,对地铁隧道采取预加固措施,优化盾构掘进参数,采取天窗期穿越、严控掘进参数、严控出土量、强化注浆、远程实时监测的施工控制措施,采用“应力补偿、主动托换地层”的变形控制理论和实行天窗点施工的施工方式,采用分段施工、单线依次穿越、天窗点施工模式的隧道预加固处理。
Construction method of subway shield tunnel underneath passing viaduct tunnel
一种地铁盾构隧道下穿高架桥隧道施工工法
LIU BIAO (Autor:in) / LIU ZHIPENG (Autor:in) / LI GUOFENG (Autor:in) / QI LAIBIN (Autor:in) / WANG KECHAO (Autor:in) / GENG YUPENG (Autor:in) / MA JIANGDONG (Autor:in) / WANG ZHIGUO (Autor:in) / LIU WENBO (Autor:in) / SUN YAXIONG (Autor:in)
05.07.2022
Patent
Elektronische Ressource
Chinesisch
Shield construction method for subway underneath passing highway
Europäisches Patentamt | 2022
|Europäisches Patentamt | 2021
|Europäisches Patentamt | 2024
|Construction method for underneath passing of existing water passing tunnel through highway tunnel
Europäisches Patentamt | 2023
|Europäisches Patentamt | 2023
|