Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Oversized frame box culvert intermediate jacking station jacking construction posture control device and use method
The invention relates to the technical field of engineering construction, and discloses an ultra-large frame box culvert intermediate jacking station jacking construction posture control device and a using method. The posture control device comprises a sleeve pre-buried in the front-section box culvert body, a limiting steel bar pre-buried in the rear-section box culvert body, a front limiting steel plate fixedly connected to the bottom of the front-section box culvert and a rear limiting steel plate fixedly connected to the bottom of the rear-section box culvert; one side edge of the front limiting steel plate extends to the position below the bottom of the rear-section box culvert, and the rear limiting steel plate is erected above the front limiting steel plate. The technical problem that in the jacking process of the intermediate jacking station of the super-large frame box culvert in the prior art, the box culvert may deviate and needs to be corrected immediately after deviation is generated is solved, automatic correction of the small offset of the box culvert is achieved, and therefore the posture control device is arranged in the box culvert to achieve posture control in the jacking process of the box culvert, and the working efficiency of the box culvert is improved. The situation that the box culvert possibly shifts in the jacking process of the intermediate jacking station is reduced, and the engineering quality can be guaranteed.
本申请涉及工程施工技术领域,公开一种超大框架箱涵中继间顶进施工姿态控制装置及使用方法,姿态控制装置位于前节箱涵和后节箱涵之间,姿态控制装置包括预埋于前节箱涵本体内的套筒、预埋于后节箱涵本体内的限位钢棒、固接于前节箱涵底部的前限位钢板以及固接于后节箱涵底部的后限位钢板;前限位钢板一侧边延伸至后节箱涵底部的下方,且后限位钢板搭设于前限位钢板的上方。本申请解决了现有技术中超大框架箱涵的中继间顶进过程中,箱涵可能发生偏移需即偏即纠的技术问题,实现了箱涵小偏移量的自动纠偏,从而在箱涵中设置姿态控制装置来实现箱涵顶进过程中的姿态控制,以减少箱涵在中继间顶进过程中的可能发生偏移的情况发生,有利于保证工程质量。
Oversized frame box culvert intermediate jacking station jacking construction posture control device and use method
The invention relates to the technical field of engineering construction, and discloses an ultra-large frame box culvert intermediate jacking station jacking construction posture control device and a using method. The posture control device comprises a sleeve pre-buried in the front-section box culvert body, a limiting steel bar pre-buried in the rear-section box culvert body, a front limiting steel plate fixedly connected to the bottom of the front-section box culvert and a rear limiting steel plate fixedly connected to the bottom of the rear-section box culvert; one side edge of the front limiting steel plate extends to the position below the bottom of the rear-section box culvert, and the rear limiting steel plate is erected above the front limiting steel plate. The technical problem that in the jacking process of the intermediate jacking station of the super-large frame box culvert in the prior art, the box culvert may deviate and needs to be corrected immediately after deviation is generated is solved, automatic correction of the small offset of the box culvert is achieved, and therefore the posture control device is arranged in the box culvert to achieve posture control in the jacking process of the box culvert, and the working efficiency of the box culvert is improved. The situation that the box culvert possibly shifts in the jacking process of the intermediate jacking station is reduced, and the engineering quality can be guaranteed.
本申请涉及工程施工技术领域,公开一种超大框架箱涵中继间顶进施工姿态控制装置及使用方法,姿态控制装置位于前节箱涵和后节箱涵之间,姿态控制装置包括预埋于前节箱涵本体内的套筒、预埋于后节箱涵本体内的限位钢棒、固接于前节箱涵底部的前限位钢板以及固接于后节箱涵底部的后限位钢板;前限位钢板一侧边延伸至后节箱涵底部的下方,且后限位钢板搭设于前限位钢板的上方。本申请解决了现有技术中超大框架箱涵的中继间顶进过程中,箱涵可能发生偏移需即偏即纠的技术问题,实现了箱涵小偏移量的自动纠偏,从而在箱涵中设置姿态控制装置来实现箱涵顶进过程中的姿态控制,以减少箱涵在中继间顶进过程中的可能发生偏移的情况发生,有利于保证工程质量。
Oversized frame box culvert intermediate jacking station jacking construction posture control device and use method
超大框架箱涵中继间顶进施工姿态控制装置及使用方法
ZHANG ZIGUANG (Autor:in) / XIA ZHIHUA (Autor:in) / TAO JIAJIA (Autor:in) / YOU XUEPING (Autor:in) / MAO RUIJIN (Autor:in) / WANG XUEFENG (Autor:in)
15.07.2022
Patent
Elektronische Ressource
Chinesisch
IPC:
E01F
ADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
,
Zusätzliche Baumaßnahmen, wie die Ausstattung von Straßen oder die bauliche Ausbildung von Bahnsteigen, Landeplätzen für Hubschrauber, Wegweisern, Schneezäunen oder dgl.
/
E02D
FOUNDATIONS
,
Gründungen
Europäisches Patentamt | 2024
|Roadbed steel corrugated pipe culvert jacking structure and jacking construction method
Europäisches Patentamt | 2022
|Jacking device and slab culvert reinforcing method adopting jacking device
Europäisches Patentamt | 2022
|Europäisches Patentamt | 2024
|