Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
The invention relates to the field of buildings, in particular to a building steel structure and a construction technology thereof. The building steel structure comprises a main beam, sunken grooves and inner buckling grooves, the sunken grooves are formed in the upper side and the lower side of the main beam, and the inner buckling grooves are formed in the front portions of the two sunken grooves. The construction technology of the building steel structure comprises the steps that S1, the two buckle plates are separated, and the two inner buckle parts are inserted into the inwards-sunken grooves in the two sides of the main beam correspondingly; s2, two inserting parts on a connecting plate are inserted into the two sliding sleeves correspondingly; s3, the two buckle plates are connected through two bolts, so that the distance between the buckle plates cannot be enlarged; and S4, it is guaranteed that each buckle plate is located between the two protruding edges on the same side. The movable connection between the steel parts can be ensured, and the connection reliability between the steel parts is ensured.
本发明涉及建筑领域,更具体的说是一种建筑钢结构及其施工工艺。一种建筑钢结构,包括主梁、内陷槽和内扣槽,所述主梁的上下两侧均设置有内陷槽,两个内陷槽的前部均设置有内扣槽。一种建筑钢结构用于施工的工艺:S1:将两个扣板分开,并且将两个内扣部分别插入主梁两侧的内陷槽处;S2:将连接板的上的两个插接部分别插在两个滑套处;S3:使用两个螺栓将两个扣板之间相连,使得扣板间距无法扩大;S4:保证每个扣板均位于同侧的两个凸棱之间。可以保证钢件之间的活动连接,保证钢件之间连接的可靠性。
The invention relates to the field of buildings, in particular to a building steel structure and a construction technology thereof. The building steel structure comprises a main beam, sunken grooves and inner buckling grooves, the sunken grooves are formed in the upper side and the lower side of the main beam, and the inner buckling grooves are formed in the front portions of the two sunken grooves. The construction technology of the building steel structure comprises the steps that S1, the two buckle plates are separated, and the two inner buckle parts are inserted into the inwards-sunken grooves in the two sides of the main beam correspondingly; s2, two inserting parts on a connecting plate are inserted into the two sliding sleeves correspondingly; s3, the two buckle plates are connected through two bolts, so that the distance between the buckle plates cannot be enlarged; and S4, it is guaranteed that each buckle plate is located between the two protruding edges on the same side. The movable connection between the steel parts can be ensured, and the connection reliability between the steel parts is ensured.
本发明涉及建筑领域,更具体的说是一种建筑钢结构及其施工工艺。一种建筑钢结构,包括主梁、内陷槽和内扣槽,所述主梁的上下两侧均设置有内陷槽,两个内陷槽的前部均设置有内扣槽。一种建筑钢结构用于施工的工艺:S1:将两个扣板分开,并且将两个内扣部分别插入主梁两侧的内陷槽处;S2:将连接板的上的两个插接部分别插在两个滑套处;S3:使用两个螺栓将两个扣板之间相连,使得扣板间距无法扩大;S4:保证每个扣板均位于同侧的两个凸棱之间。可以保证钢件之间的活动连接,保证钢件之间连接的可靠性。
Building steel structure and construction technology thereof
一种建筑钢结构及其施工工艺
WU PANJIE (Autor:in)
22.07.2022
Patent
Elektronische Ressource
Chinesisch
Building steel structure and construction technology thereof
Europäisches Patentamt | 2023
|Steel structure building and construction technology thereof
Europäisches Patentamt | 2024
|Fabricated building steel structure and construction technology
Europäisches Patentamt | 2024
|Steel structure factory building convenient to extend and construction technology thereof
Europäisches Patentamt | 2023
|Prefabricated steel structure building installation construction technology
Europäisches Patentamt | 2024
|