Concrete prefabricated culvert frame structure for constructional engineering and construction method of concrete prefabricated culvert frame structure
The invention discloses a concrete prefabricated culvert frame structure for constructional engineering and a construction method of the concrete prefabricated culvert frame structure, relates to the technical field of prefabricated culverts, and aims to solve the problems that an existing prefabricated culvert frame connecting structure cannot be adjusted according to a concrete pouring structure and is poor in compression resistance and buffering performance. A culvert upper structure is arranged at the upper end of the culvert side structure, the culvert upper structure and the side face of the culvert side structure are kept on the same horizontal plane, the culvert side structure is composed of a culvert side frame, two first side formworks, a first rear formwork and a first bottom formwork, the first side formworks are located on the two sides of the culvert side frame, and the second side formworks are located on the two sides of the first rear formwork. The first rear formwork is located at the bottom of the culvert side frame, the culvert upper structure is composed of a culvert upper frame, a second rear formwork, a second side formwork and a second bottom formwork, the culvert side frame and the culvert upper frame are each composed of a frame cross beam and a frame longitudinal beam, and adjusting sleeves are arranged at the two ends of the outer portion of each frame cross beam and the two ends of the outer portion of each frame longitudinal beam.
本发明公开了一种建筑工程用混凝土预制涵洞框构及其施工方法,涉及预制涵洞技术领域,为解决现有的预制涵洞框架连接结构无法根据混凝土浇筑结构进行调整以及抗压缓冲性能较差的问题。所述涵洞侧结构的上端设置有涵洞上结构,且涵洞上结构与涵洞侧结构侧面保持在同一水平面,所述涵洞侧结构由涵洞侧框架、第一侧模板、第一后模板和第一底模板组成,第一侧模板设置有两个,且第一侧模板位于涵洞侧框架的两侧,第一底模板位于涵洞侧框架的底部,所述涵洞上结构由涵洞上框架、第二后模板、第二侧模板和第二底模板组成,所述涵洞侧框架和涵洞上框架均由框架横梁和框架纵梁组成,所述框架横梁和框架纵梁外部的两端均设置有调节套管。
Concrete prefabricated culvert frame structure for constructional engineering and construction method of concrete prefabricated culvert frame structure
The invention discloses a concrete prefabricated culvert frame structure for constructional engineering and a construction method of the concrete prefabricated culvert frame structure, relates to the technical field of prefabricated culverts, and aims to solve the problems that an existing prefabricated culvert frame connecting structure cannot be adjusted according to a concrete pouring structure and is poor in compression resistance and buffering performance. A culvert upper structure is arranged at the upper end of the culvert side structure, the culvert upper structure and the side face of the culvert side structure are kept on the same horizontal plane, the culvert side structure is composed of a culvert side frame, two first side formworks, a first rear formwork and a first bottom formwork, the first side formworks are located on the two sides of the culvert side frame, and the second side formworks are located on the two sides of the first rear formwork. The first rear formwork is located at the bottom of the culvert side frame, the culvert upper structure is composed of a culvert upper frame, a second rear formwork, a second side formwork and a second bottom formwork, the culvert side frame and the culvert upper frame are each composed of a frame cross beam and a frame longitudinal beam, and adjusting sleeves are arranged at the two ends of the outer portion of each frame cross beam and the two ends of the outer portion of each frame longitudinal beam.
本发明公开了一种建筑工程用混凝土预制涵洞框构及其施工方法,涉及预制涵洞技术领域,为解决现有的预制涵洞框架连接结构无法根据混凝土浇筑结构进行调整以及抗压缓冲性能较差的问题。所述涵洞侧结构的上端设置有涵洞上结构,且涵洞上结构与涵洞侧结构侧面保持在同一水平面,所述涵洞侧结构由涵洞侧框架、第一侧模板、第一后模板和第一底模板组成,第一侧模板设置有两个,且第一侧模板位于涵洞侧框架的两侧,第一底模板位于涵洞侧框架的底部,所述涵洞上结构由涵洞上框架、第二后模板、第二侧模板和第二底模板组成,所述涵洞侧框架和涵洞上框架均由框架横梁和框架纵梁组成,所述框架横梁和框架纵梁外部的两端均设置有调节套管。
Concrete prefabricated culvert frame structure for constructional engineering and construction method of concrete prefabricated culvert frame structure
一种建筑工程用混凝土预制涵洞框构及其施工方法
ZHANG RONGMING (Autor:in)
26.07.2022
Patent
Elektronische Ressource
Chinesisch
IPC:
E01F
ADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
,
Zusätzliche Baumaßnahmen, wie die Ausstattung von Straßen oder die bauliche Ausbildung von Bahnsteigen, Landeplätzen für Hubschrauber, Wegweisern, Schneezäunen oder dgl.
prefabricated concrete double-layer corrugated plate structure, arch culvert and pipe culvert