Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
A combined external corner section steel cantilever frame construction method is characterized by comprising the following steps that a, a plurality of embedded parts are arranged, and b, an external corner section steel cantilever frame is arranged and comprises the following steps that (1) according to the design, the external corner section steel cantilever frame comprises an external corner section steel cantilever core section and auxiliary sections on the two sides of the core section, and the core section is provided with a horizontal beam and a cross beam; (2) the auxiliary section is provided with a plurality of horizontal beams which are the same as the horizontal beams arranged on the core section in structure, and c, an external corner type steel cantilever frame is installed, a combined cantilever main beam is hoisted, and an end steel plate is connected with the pre-embedded high-strength bolts. The construction method of the combined external corner section steel cantilever frame has the advantages that a large amount of section steel is not needed, the components can be processed in a sectioned and factory mode, the installation efficiency is high, the overall surface is smooth, the quality is guaranteed, the construction is safe, and the subsequent procedure construction in a floor is not affected.
一种组合式阳角型钢悬挑架施工方法,其特征在于包括以下步骤:a、设置若干预埋件,b、设置阳角型钢悬挑架,包括以下步骤:(1)根据设计阳角型钢悬挑架包括阳角型钢悬挑核心段、核心段两侧辅助段,所述核心段设有水平梁、横梁,(2)所述辅助段设有若干与核心段设有水平梁结构相同的水平梁,c、安装阳角型钢悬挑架,吊装组合式悬挑主梁,端部钢板与预埋高强螺栓连接。本发明的组合式阳角型钢悬挑架施工方法具有不需要大量型钢、组件可分段工厂化加工、安装工效高,整体表面平整、质量保证、施工安全和不影响楼层内后续工序施工的优点。
A combined external corner section steel cantilever frame construction method is characterized by comprising the following steps that a, a plurality of embedded parts are arranged, and b, an external corner section steel cantilever frame is arranged and comprises the following steps that (1) according to the design, the external corner section steel cantilever frame comprises an external corner section steel cantilever core section and auxiliary sections on the two sides of the core section, and the core section is provided with a horizontal beam and a cross beam; (2) the auxiliary section is provided with a plurality of horizontal beams which are the same as the horizontal beams arranged on the core section in structure, and c, an external corner type steel cantilever frame is installed, a combined cantilever main beam is hoisted, and an end steel plate is connected with the pre-embedded high-strength bolts. The construction method of the combined external corner section steel cantilever frame has the advantages that a large amount of section steel is not needed, the components can be processed in a sectioned and factory mode, the installation efficiency is high, the overall surface is smooth, the quality is guaranteed, the construction is safe, and the subsequent procedure construction in a floor is not affected.
一种组合式阳角型钢悬挑架施工方法,其特征在于包括以下步骤:a、设置若干预埋件,b、设置阳角型钢悬挑架,包括以下步骤:(1)根据设计阳角型钢悬挑架包括阳角型钢悬挑核心段、核心段两侧辅助段,所述核心段设有水平梁、横梁,(2)所述辅助段设有若干与核心段设有水平梁结构相同的水平梁,c、安装阳角型钢悬挑架,吊装组合式悬挑主梁,端部钢板与预埋高强螺栓连接。本发明的组合式阳角型钢悬挑架施工方法具有不需要大量型钢、组件可分段工厂化加工、安装工效高,整体表面平整、质量保证、施工安全和不影响楼层内后续工序施工的优点。
Cantilever plate external corner reinforcement construction method
Europäisches Patentamt | 2022
|Method for erecting high-altitude large-cantilever modeling external corner template frame body
Europäisches Patentamt | 2021
|Anchoring type I-shaped steel cantilever frame component and construction method
Europäisches Patentamt | 2021
|Angle-adjustable external corner turn buckle cantilever I-shaped steel structure
Europäisches Patentamt | 2024
|Europäisches Patentamt | 2022
|