Modularized installation method for steel structure industrial building
The invention discloses a modular installation method for a steel structure industrial building, relates to the technical field of modular installation of steel structure buildings, and provides the following scheme aiming at the problem of difficulty in construction in the prior art: the modular installation method comprises the following steps: S1, cleaning the ground, drawing a positioning label on a basic surface, measuring the ground elevation and preparing a cushion block; s2, while the step S1 is carried out, a connecting plate is installed at the top end of the stand column at the other station, the stand column is moved to the position where the positioning label is drawn to be placed, and marking is carried out at the position 1 m below the bracket; s3, when the step S2 is carried out, a roof hoisting unit is assembled at another station and moved to a safe position, a large amount of high-altitude operation can be completed on the ground, the workload of the high-altitude operation is reduced, the safety risk is reduced, inspection is easy, in addition, the construction method facilitates organization of cross line production, the work efficiency can be improved, and the construction period can be shortened; turnover materials and auxiliary facilities can be effectively reduced, the technical requirements on constructors are relatively low, and the construction cost is saved.
本发明公开了一种钢结构工业建筑模块化安装方法,涉及钢结构建筑模块化安装技术领域,针对现有的施工困难的问题,现提出如下方案,其包括以下步骤:S1:清理地面,并在基础面上画上定位标签,测量地面标高,准备垫块;S2:在步骤S1进行的同时,在另一工位将立柱顶端安装连接板,并移位到已经画好定位标签处位置放置,并且在牛腿下1m处进行标记;S3:在步骤S2进行的同时,在另一工位拼装屋面吊装单元,并移位到安全位置,本发明可将大量高空作业在地面完成,减少高空作业工作量、降低安全风险,同易于检查另外该工法便于组织交叉流水作业,能提高工效,缩短工期;可有效减少周转材料、辅助设施,对施工人员技术要求相对较低,节约施工成本。
Modularized installation method for steel structure industrial building
The invention discloses a modular installation method for a steel structure industrial building, relates to the technical field of modular installation of steel structure buildings, and provides the following scheme aiming at the problem of difficulty in construction in the prior art: the modular installation method comprises the following steps: S1, cleaning the ground, drawing a positioning label on a basic surface, measuring the ground elevation and preparing a cushion block; s2, while the step S1 is carried out, a connecting plate is installed at the top end of the stand column at the other station, the stand column is moved to the position where the positioning label is drawn to be placed, and marking is carried out at the position 1 m below the bracket; s3, when the step S2 is carried out, a roof hoisting unit is assembled at another station and moved to a safe position, a large amount of high-altitude operation can be completed on the ground, the workload of the high-altitude operation is reduced, the safety risk is reduced, inspection is easy, in addition, the construction method facilitates organization of cross line production, the work efficiency can be improved, and the construction period can be shortened; turnover materials and auxiliary facilities can be effectively reduced, the technical requirements on constructors are relatively low, and the construction cost is saved.
本发明公开了一种钢结构工业建筑模块化安装方法,涉及钢结构建筑模块化安装技术领域,针对现有的施工困难的问题,现提出如下方案,其包括以下步骤:S1:清理地面,并在基础面上画上定位标签,测量地面标高,准备垫块;S2:在步骤S1进行的同时,在另一工位将立柱顶端安装连接板,并移位到已经画好定位标签处位置放置,并且在牛腿下1m处进行标记;S3:在步骤S2进行的同时,在另一工位拼装屋面吊装单元,并移位到安全位置,本发明可将大量高空作业在地面完成,减少高空作业工作量、降低安全风险,同易于检查另外该工法便于组织交叉流水作业,能提高工效,缩短工期;可有效减少周转材料、辅助设施,对施工人员技术要求相对较低,节约施工成本。
Modularized installation method for steel structure industrial building
一种钢结构工业建筑模块化安装方法
TONG LINLANG (Autor:in) / HU QIFEI (Autor:in) / XIE YIJUN (Autor:in) / HUANG LIXIA (Autor:in) / LI ZHEN (Autor:in)
02.08.2022
Patent
Elektronische Ressource
Chinesisch
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Europäisches Patentamt | 2024
|Modularized installation waterproof structure for factory building
Europäisches Patentamt | 2023
|Modularized installation method for steel structure pipe gallery
Europäisches Patentamt | 2024
|Europäisches Patentamt | 2023
|