Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
The invention aims to solve the reinforcing problem of a building wall, and discloses a building wall reinforcing device which comprises a fourth motor, a stirring rod is installed on the left side of the fourth motor, a guide ring is fixedly installed at the lower left corner of the surface of the fourth motor, a sliding pipe is sleeved with the guide ring, and the right side of the surface of the sliding pipe is sleeved with a nut. A first spiral spring is connected between the nut and the guide ring, a scraping plate is fixedly installed at the left end of a sliding pipe, through holes are evenly formed in the side face of the sliding plate, a connecting frame is fixedly installed on the surface of a fourth motor, the surface of the connecting frame is sleeved with a positioning pipe, and a feeding cylinder is installed on the surface of the positioning pipe; a rotating piece is installed between the feeding cylinder and the positioning pipe, and a second inclined frame is fixedly installed on the upper side of the left side face of the feeding cylinder. Half of the wall body is replaced with new bricks, so that the waste of the bricks is reduced, the reinforcement of the wall body is increased, and the wall body is firmer.
本发明的目的是为了解决建筑墙体的加固问题,公开了一种建筑墙体加固装置,包括第四电机,所述第四电机左侧安装有搅拌杆,所述第四电机表面左下角固定安装有导向环,所述导向环内部套有滑管,所述滑管表面右侧套有螺帽,所述螺帽与导向环之间连接有第一螺旋弹簧,所述滑管左端固定安装有刮板,所述滑板侧面均匀开有通孔,所述第四电机表面固定安装有连接架,所述连接架表面套装有定位管,所述定位管表面装有加料筒,所述加料筒与定位管之间装有旋转件,所述加料筒左侧面上侧固定安装有第二斜架。本发明通过将墙体的一半进行更换新的砖块,在减少对砖块浪费的同时也增加了对墙体的加固,使墙体更加牢固。
The invention aims to solve the reinforcing problem of a building wall, and discloses a building wall reinforcing device which comprises a fourth motor, a stirring rod is installed on the left side of the fourth motor, a guide ring is fixedly installed at the lower left corner of the surface of the fourth motor, a sliding pipe is sleeved with the guide ring, and the right side of the surface of the sliding pipe is sleeved with a nut. A first spiral spring is connected between the nut and the guide ring, a scraping plate is fixedly installed at the left end of a sliding pipe, through holes are evenly formed in the side face of the sliding plate, a connecting frame is fixedly installed on the surface of a fourth motor, the surface of the connecting frame is sleeved with a positioning pipe, and a feeding cylinder is installed on the surface of the positioning pipe; a rotating piece is installed between the feeding cylinder and the positioning pipe, and a second inclined frame is fixedly installed on the upper side of the left side face of the feeding cylinder. Half of the wall body is replaced with new bricks, so that the waste of the bricks is reduced, the reinforcement of the wall body is increased, and the wall body is firmer.
本发明的目的是为了解决建筑墙体的加固问题,公开了一种建筑墙体加固装置,包括第四电机,所述第四电机左侧安装有搅拌杆,所述第四电机表面左下角固定安装有导向环,所述导向环内部套有滑管,所述滑管表面右侧套有螺帽,所述螺帽与导向环之间连接有第一螺旋弹簧,所述滑管左端固定安装有刮板,所述滑板侧面均匀开有通孔,所述第四电机表面固定安装有连接架,所述连接架表面套装有定位管,所述定位管表面装有加料筒,所述加料筒与定位管之间装有旋转件,所述加料筒左侧面上侧固定安装有第二斜架。本发明通过将墙体的一半进行更换新的砖块,在减少对砖块浪费的同时也增加了对墙体的加固,使墙体更加牢固。
Building wall reinforcing device and reinforcing method thereof
Europäisches Patentamt | 2023
|Building wall reinforcing device and reinforcing method thereof
Europäisches Patentamt | 2024
|Fabricated building wall connection reinforcing device
Europäisches Patentamt | 2022
|