Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Method for building house by combining straw building material and reinforced concrete structure
The invention discloses a straw building material and reinforced concrete structure combined house construction method, relates to the technical field of house construction, solves the technical problem of poor fireproof performance of an existing house structure, and comprises the following steps: (1) building a house framework: adopting reinforced concrete to construct a foundation and a beam column frame; (2) building roofs: installing a roof pouring mold on each layer of roof, and injecting a straw building material mixture into the roof pouring molds; (3) building a roof: mounting a roof pouring mold on the roof, and injecting a straw building material mixture into the roof pouring mold; (4) wall body building: installing a wall body pouring mold on each wall body, and injecting a straw building material mixture into the wall body pouring molds; (5) naturally curing for 18-22 days, and dismantling the roof pouring mold of each layer of roof, the roof pouring mold and the wall body pouring mold of each wall body; the fireproof and anti-seismic composite material has good fireproof and anti-seismic capabilities.
本发明公开了秸秆建材和钢筋混凝土结构相结合的房屋建造方法,涉及房屋建设技术领域,解决现有房屋结构存在防火性能较差的技术问题,包括如下步骤:(1)建造房屋骨架:采用钢筋混凝土建造地基和梁柱框架;(2)建造屋面:每层屋面安装屋面浇筑模具,往屋面浇筑模具内注入秸秆建材混合物;(3)建造屋顶:屋顶安装屋顶浇筑模具,往屋顶浇筑模具内注入秸秆建材混合物;(4)建造墙体:每面墙体安装墙体浇筑模具,往墙体浇筑模具内注入秸秆建材混合物;(5)自然养护18‑22天,拆除每层屋面的屋面浇筑模具、屋顶浇筑模具和每面墙体的墙体浇筑模具;本发明具有良好的防火和抗震能力。
Method for building house by combining straw building material and reinforced concrete structure
The invention discloses a straw building material and reinforced concrete structure combined house construction method, relates to the technical field of house construction, solves the technical problem of poor fireproof performance of an existing house structure, and comprises the following steps: (1) building a house framework: adopting reinforced concrete to construct a foundation and a beam column frame; (2) building roofs: installing a roof pouring mold on each layer of roof, and injecting a straw building material mixture into the roof pouring molds; (3) building a roof: mounting a roof pouring mold on the roof, and injecting a straw building material mixture into the roof pouring mold; (4) wall body building: installing a wall body pouring mold on each wall body, and injecting a straw building material mixture into the wall body pouring molds; (5) naturally curing for 18-22 days, and dismantling the roof pouring mold of each layer of roof, the roof pouring mold and the wall body pouring mold of each wall body; the fireproof and anti-seismic composite material has good fireproof and anti-seismic capabilities.
本发明公开了秸秆建材和钢筋混凝土结构相结合的房屋建造方法,涉及房屋建设技术领域,解决现有房屋结构存在防火性能较差的技术问题,包括如下步骤:(1)建造房屋骨架:采用钢筋混凝土建造地基和梁柱框架;(2)建造屋面:每层屋面安装屋面浇筑模具,往屋面浇筑模具内注入秸秆建材混合物;(3)建造屋顶:屋顶安装屋顶浇筑模具,往屋顶浇筑模具内注入秸秆建材混合物;(4)建造墙体:每面墙体安装墙体浇筑模具,往墙体浇筑模具内注入秸秆建材混合物;(5)自然养护18‑22天,拆除每层屋面的屋面浇筑模具、屋顶浇筑模具和每面墙体的墙体浇筑模具;本发明具有良好的防火和抗震能力。
Method for building house by combining straw building material and reinforced concrete structure
秸秆建材和钢筋混凝土结构相结合的房屋建造方法
LI MINGQING (Autor:in) / LIU WEI (Autor:in)
09.08.2022
Patent
Elektronische Ressource
Chinesisch
Reinforcing structure of reinforced concrete building house and construction method
Europäisches Patentamt | 2023
|Reinforcing structure of reinforced concrete building house and construction method
Europäisches Patentamt | 2020
|British Library Online Contents | 2002
Reinforced concrete house building offers attractive market
Engineering Index Backfile | 1935
|