Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Confined water observation well structure and construction method
The invention discloses a confined water observation well structure and a construction method.The observation well structure comprises a vertical hole channel, a well pipe, a data recorder, an information sensing line and a water level and temperature automatic recorder, the well pipe is located in the vertical hole channel, a well lid device is arranged at a well mouth of the well pipe, a water filtering pipe is welded to the bottom of the well pipe, and the water level and temperature automatic recorder is arranged on the water filtering pipe. The water level and temperature automatic recorder naturally falls to the position near the water line from a well mouth of the well casing, one end of the information sensing line is connected with the water level and temperature automatic recorder, and the other end of the information sensing line penetrates through the well lid device and then is connected with the data recorder. The observation well is convenient to use, more convenient and efficient, the experiment accuracy is improved, the workload of manually measuring the water level in a well mouth is greatly reduced, the automatic, implementation and continuous monitoring functions are achieved, and the monitoring accuracy, the working efficiency and the well completion precision are improved; the well lid at the well mouth position effectively protects the working well, and provides effective guarantee for subsequent measurement and monitoring work.
本发明公开了一种承压水观测井结构及施工方法,观测井结构包括竖直孔道、井管、数据记录仪、信息传感线和水位温度自动记录仪,所述井管位于所述竖直孔道内,所述井管的井口处设有井盖装置,所述井管的底部焊接有滤水管,所述水位温度自动记录仪从所述井管的井口自然下落至水位线附近处,所述信息传感线一端连接所述水位温度自动记录仪,另一端穿过所述井盖装置后与所述数据记录仪相连接。本观测井使用方便,更加便捷高效,提高实验准确性,极大地减轻了人工测量井口内水位的工作量,实现了自动化、实施化、连续监测功能,提高了监测的准确性和工作效率,以及成井精准度;井口位置的井盖有效保护了工作井,为后面的测量监控工作提供有效保障。
Confined water observation well structure and construction method
The invention discloses a confined water observation well structure and a construction method.The observation well structure comprises a vertical hole channel, a well pipe, a data recorder, an information sensing line and a water level and temperature automatic recorder, the well pipe is located in the vertical hole channel, a well lid device is arranged at a well mouth of the well pipe, a water filtering pipe is welded to the bottom of the well pipe, and the water level and temperature automatic recorder is arranged on the water filtering pipe. The water level and temperature automatic recorder naturally falls to the position near the water line from a well mouth of the well casing, one end of the information sensing line is connected with the water level and temperature automatic recorder, and the other end of the information sensing line penetrates through the well lid device and then is connected with the data recorder. The observation well is convenient to use, more convenient and efficient, the experiment accuracy is improved, the workload of manually measuring the water level in a well mouth is greatly reduced, the automatic, implementation and continuous monitoring functions are achieved, and the monitoring accuracy, the working efficiency and the well completion precision are improved; the well lid at the well mouth position effectively protects the working well, and provides effective guarantee for subsequent measurement and monitoring work.
本发明公开了一种承压水观测井结构及施工方法,观测井结构包括竖直孔道、井管、数据记录仪、信息传感线和水位温度自动记录仪,所述井管位于所述竖直孔道内,所述井管的井口处设有井盖装置,所述井管的底部焊接有滤水管,所述水位温度自动记录仪从所述井管的井口自然下落至水位线附近处,所述信息传感线一端连接所述水位温度自动记录仪,另一端穿过所述井盖装置后与所述数据记录仪相连接。本观测井使用方便,更加便捷高效,提高实验准确性,极大地减轻了人工测量井口内水位的工作量,实现了自动化、实施化、连续监测功能,提高了监测的准确性和工作效率,以及成井精准度;井口位置的井盖有效保护了工作井,为后面的测量监控工作提供有效保障。
Confined water observation well structure and construction method
一种承压水观测井结构及施工方法
WANG QINGLEI (Autor:in) / WAN PENG (Autor:in) / DING GUOHONG (Autor:in) / HUANG XING (Autor:in) / LI YUKUN (Autor:in) / DU CHENSHU (Autor:in)
26.08.2022
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
/
E21B
EARTH OR ROCK DRILLING
,
Erd- oder Gesteinsbohren
/
G01C
Messen von Entfernungen, Höhen, Neigungen oder Richtungen
,
MEASURING DISTANCES, LEVELS OR BEARINGS
/
G01F
Messen des Volumens, des Durchflussvolumens, des Massendurchflusses oder des Füllstandes
,
MEASURING VOLUME, VOLUME FLOW, MASS FLOW, OR LIQUID LEVEL
Confined water precipitation well sealing device and construction method
Europäisches Patentamt | 2020
|Blocking structure of confined water head downcast tube well and construction method
Europäisches Patentamt | 2024
|Confined water dewatering well structure and dewatering method
Europäisches Patentamt | 2020
|Construction and field observation of twin tunnels in sandy soil with confined water
British Library Conference Proceedings | 2003
|