The invention relates to a bolt-connected double-sided laminated wall and a construction method thereof.The bolt-connected double-sided laminated wall comprises a double-sided laminated wall body, a plurality of connecting rods are arranged at the top end of the double-sided laminated wall body, external threads are arranged on the upper portions of the connecting rods, and a plurality of connecting holes matched with the connecting rods are formed in the bottom end of the double-sided laminated wall body; a plurality of grooves are formed in the outer vertical face of the double-face laminated wall body, and the top ends of the connecting holes are communicated with the grooves. According to the double-sided laminated wall connected through the bolts and the construction method of the double-sided laminated wall, the splicing construction speed is high, the self-sealing performance is good, and meanwhile the integrity of the fabricated underground diaphragm wall and the water stopping performance of connecting seams are improved through a staggered joint combination mode; when the prefabricated double-sided laminated wall is processed, a water stop piece is reserved at the wall bottom, and an additional horizontal rib is reserved on the wall side, so that the integrality of the joint is improved, and the assembly advantage is embodied; the method is environment-friendly, and construction can be completed only by hoisting machinery.
本发明涉及一种螺栓连接的双面叠合墙及其施工方法,包括:双面叠合墙本体,所述双面叠合墙本体顶端设有多根连接杆,所述连接杆上部设有外螺纹,所述双面叠合墙本体底端设有多个与所述连接杆相匹配的连接孔,且所述双面叠合墙本体外立面上设有多个凹槽,所述连接孔的顶端连通所述凹槽。本发明提供的螺栓连接的双面叠合墙及其施工方法,拼装施工速度快、自密性能好,同时错口结合的形式也提高装配式地连墙的整体性与连接缝的止水性能;预制双面叠合墙在加工时便在墙底留设止水件,墙侧留设附加水平筋,提高节点的整体性,体现装配优势;环境友好,只需吊装机械即可完成施工。
Bolt-connected double-sided laminated wall and construction method thereof
The invention relates to a bolt-connected double-sided laminated wall and a construction method thereof.The bolt-connected double-sided laminated wall comprises a double-sided laminated wall body, a plurality of connecting rods are arranged at the top end of the double-sided laminated wall body, external threads are arranged on the upper portions of the connecting rods, and a plurality of connecting holes matched with the connecting rods are formed in the bottom end of the double-sided laminated wall body; a plurality of grooves are formed in the outer vertical face of the double-face laminated wall body, and the top ends of the connecting holes are communicated with the grooves. According to the double-sided laminated wall connected through the bolts and the construction method of the double-sided laminated wall, the splicing construction speed is high, the self-sealing performance is good, and meanwhile the integrity of the fabricated underground diaphragm wall and the water stopping performance of connecting seams are improved through a staggered joint combination mode; when the prefabricated double-sided laminated wall is processed, a water stop piece is reserved at the wall bottom, and an additional horizontal rib is reserved on the wall side, so that the integrality of the joint is improved, and the assembly advantage is embodied; the method is environment-friendly, and construction can be completed only by hoisting machinery.
本发明涉及一种螺栓连接的双面叠合墙及其施工方法,包括:双面叠合墙本体,所述双面叠合墙本体顶端设有多根连接杆,所述连接杆上部设有外螺纹,所述双面叠合墙本体底端设有多个与所述连接杆相匹配的连接孔,且所述双面叠合墙本体外立面上设有多个凹槽,所述连接孔的顶端连通所述凹槽。本发明提供的螺栓连接的双面叠合墙及其施工方法,拼装施工速度快、自密性能好,同时错口结合的形式也提高装配式地连墙的整体性与连接缝的止水性能;预制双面叠合墙在加工时便在墙底留设止水件,墙侧留设附加水平筋,提高节点的整体性,体现装配优势;环境友好,只需吊装机械即可完成施工。
Bolt-connected double-sided laminated wall and construction method thereof
一种螺栓连接的双面叠合墙及其施工方法
MA YUEQIANG (Autor:in) / LONG LIBO (Autor:in) / ZHANG YICHI (Autor:in) / YU YALEI (Autor:in) / ZHENG JINYU (Autor:in)
26.08.2022
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Two-way bolt-connected double-faced laminated wall and construction method thereof
Europäisches Patentamt | 2022
|Europäisches Patentamt | 2022
|Steel plate truss double-sided laminated shear wall and construction method thereof
Europäisches Patentamt | 2021
|Construction method for double-sided laminated shear wall of transformer substation