Large-area concrete skip construction method
A large-area concrete alternate warehouse construction method is characterized by comprising the following steps of a, division of large-area concrete construction separate warehouse grids, b, concrete pouring sequence of the warehouse grids, c, arrangement of construction joints and d, treatment of the construction joints. The large-area concrete skip construction method has the advantages that the problem of release of temperature thermal stress of concrete within 7-10 days is solved by the construction policy of'resistance and release, first release and then resistance, and resistance mainly ', the construction procedure is simplified, the construction progress is accelerated, the construction quality is ensured, the cost is reduced, and the construction period is shortened.
一种大面积混凝土跳仓施工方法,其特征在于包括以下步骤:a、大面积混凝土施工分仓仓格的划分,b、仓格的混凝土浇筑顺序,c、施工缝的设置,d、施工缝的处理。本发明的大面积混凝土跳仓施工方法具有“抗放兼施,先放后抗,以抗为主”的施工方针解决混凝土在7到10天内温度热应力的释放,简化施工工序、加快施工进度,保证施工质量,减少成本和缩短工期的优点。
Large-area concrete skip construction method
A large-area concrete alternate warehouse construction method is characterized by comprising the following steps of a, division of large-area concrete construction separate warehouse grids, b, concrete pouring sequence of the warehouse grids, c, arrangement of construction joints and d, treatment of the construction joints. The large-area concrete skip construction method has the advantages that the problem of release of temperature thermal stress of concrete within 7-10 days is solved by the construction policy of'resistance and release, first release and then resistance, and resistance mainly ', the construction procedure is simplified, the construction progress is accelerated, the construction quality is ensured, the cost is reduced, and the construction period is shortened.
一种大面积混凝土跳仓施工方法,其特征在于包括以下步骤:a、大面积混凝土施工分仓仓格的划分,b、仓格的混凝土浇筑顺序,c、施工缝的设置,d、施工缝的处理。本发明的大面积混凝土跳仓施工方法具有“抗放兼施,先放后抗,以抗为主”的施工方针解决混凝土在7到10天内温度热应力的释放,简化施工工序、加快施工进度,保证施工质量,减少成本和缩短工期的优点。
Large-area concrete skip construction method
一种大面积混凝土跳仓施工方法
ZHAO PENGFEI (Autor:in)
30.08.2022
Patent
Elektronische Ressource
Chinesisch
Seamless skip construction method for super-large-area concrete structure
Europäisches Patentamt | 2024
|Ultra-long and ultra-wide large-volume concrete foundation dislocation skip construction method
Europäisches Patentamt | 2023
|Raft foundation mass concrete skip method construction device and process
Europäisches Patentamt | 2024
|