The invention provides an alternate warehouse construction method. The alternate warehouse construction method at least comprises the following steps that S10, warehouse grids are divided; s20, concrete is prepared; s30, concrete is poured, specifically, the concrete is poured into the multiple bin grids distributed at intervals, then the concrete is poured into the multiple remaining bin grids, and the pouring interval time of every two adjacent bin grids is not less than seven days; and S40, concrete curing. According to the alternate warehouse construction method, the concrete is poured into the multiple warehouse grids distributed at intervals, then the concrete is poured into the remaining warehouse grids, and the pouring interval time of every two adjacent warehouse grids is not less than seven days. In this way, the tensile strength of the concrete can be used for resisting shrinkage stress in the later period, the purpose of preventing the concrete from cracking is achieved, and the forming quality of the concrete can be effectively improved. And a post-cast strip can be omitted, so that the construction progress can be accelerated, and turnover materials can be utilized. In addition, the concrete is cured after being poured, so that plastic deformation of the concrete can be effectively avoided, and the concrete is further prevented from cracking.
本申请提供了一种跳仓施工方法,至少包括以下步骤:S10:划分仓格;S20:配置混凝土;S30:浇筑混凝土,在间隔分布的多个仓格内浇筑混凝土,再向剩余的多个仓格内浇筑混凝土,且相邻两个仓格浇筑间隔时间不少于七天;S40:养护混凝土。本申请提供的跳仓施工方法,先向多个间隔分布的仓格内浇筑混凝土,再向剩余的仓格内浇筑混凝土,相邻两个仓格浇筑间隔时间不少于七天。这样能够利用混凝土本身的抗拉强度来抵抗后期的收缩应力,达到防止混凝土开裂的目的,能够有效提高混凝土的成型质量。并且能够取消后浇带,有利于加快施工进度和周转材料的利用。除此之外,在浇筑混凝土之后养护混凝土,这样能够有效地混凝土的塑性变形,进一步防止混凝土开裂。
Skip construction method
The invention provides an alternate warehouse construction method. The alternate warehouse construction method at least comprises the following steps that S10, warehouse grids are divided; s20, concrete is prepared; s30, concrete is poured, specifically, the concrete is poured into the multiple bin grids distributed at intervals, then the concrete is poured into the multiple remaining bin grids, and the pouring interval time of every two adjacent bin grids is not less than seven days; and S40, concrete curing. According to the alternate warehouse construction method, the concrete is poured into the multiple warehouse grids distributed at intervals, then the concrete is poured into the remaining warehouse grids, and the pouring interval time of every two adjacent warehouse grids is not less than seven days. In this way, the tensile strength of the concrete can be used for resisting shrinkage stress in the later period, the purpose of preventing the concrete from cracking is achieved, and the forming quality of the concrete can be effectively improved. And a post-cast strip can be omitted, so that the construction progress can be accelerated, and turnover materials can be utilized. In addition, the concrete is cured after being poured, so that plastic deformation of the concrete can be effectively avoided, and the concrete is further prevented from cracking.
本申请提供了一种跳仓施工方法,至少包括以下步骤:S10:划分仓格;S20:配置混凝土;S30:浇筑混凝土,在间隔分布的多个仓格内浇筑混凝土,再向剩余的多个仓格内浇筑混凝土,且相邻两个仓格浇筑间隔时间不少于七天;S40:养护混凝土。本申请提供的跳仓施工方法,先向多个间隔分布的仓格内浇筑混凝土,再向剩余的仓格内浇筑混凝土,相邻两个仓格浇筑间隔时间不少于七天。这样能够利用混凝土本身的抗拉强度来抵抗后期的收缩应力,达到防止混凝土开裂的目的,能够有效提高混凝土的成型质量。并且能够取消后浇带,有利于加快施工进度和周转材料的利用。除此之外,在浇筑混凝土之后养护混凝土,这样能够有效地混凝土的塑性变形,进一步防止混凝土开裂。
Skip construction method
跳仓施工方法
ZHAN XINBIN (Autor:in) / LUO GANG (Autor:in) / LI ZHE (Autor:in) / ZHANG YU (Autor:in) / LUO JIANPO (Autor:in) / ZHOU LIJUN (Autor:in) / LIU JUN (Autor:in) / LIU TAO (Autor:in) / CHEN YANG (Autor:in) / LIU CHENG (Autor:in)
23.06.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Construction method of underground garage raft skip method