Precast pile sinking construction method
The invention relates to a pile foundation construction technology, in particular to a precast pile sinking method which comprises bases, a rack and a pile planting device, the bases are located on the front side and the rear side of the rack, the bases are sliding rails, sliding grooves are formed in the sliding rails, first sliding motors are arranged on the two sides of the rack, the first sliding motors are in sliding connection with the sliding grooves, and the pile planting device is arranged on the rack. The drilling system is arranged to form a prefabricated pile hole in the pile sinking position in advance, so that pile sinking is completed more rapidly and stably during pile lifting, the situation that when the pile is hit and sunk, the lifted pile is prone to bursting or the sinking angle deviates, and consequently the pile is damaged is avoided, and the pile sinking efficiency is improved; and the drilling system and the hydraulic pile sinking system rotate on the equipment workbench through the pile planting platform to adjust different construction systems, so that the construction device is prevented from being moved back and forth when the construction device is replaced, and the construction efficiency is further improved.
本发明涉及桩基施工技术,具体为一种预制桩沉桩工法,包括基座、机架以及植桩装置,所述基座位于机架的前后两侧,所述基座为滑轨,所述滑轨上设有滑槽,所述机架的两侧设有第一滑动电机,所述第一滑动电机与滑槽滑动连接,所述机架的前后两侧均安装有第一液压机,本发明通过设置钻孔系统在沉桩位置处提前开设预制桩孔,从而使吊桩更加快速稳定的的完成沉桩,避免在击打沉桩时,吊桩容易爆碎或沉入角度出现偏差造成坏桩,从而提高沉桩效率,钻孔系统以及液压沉桩系统通过植桩平台在设备工作台上转动对不同的施工系统进行调节,从而避免再调换施工装置时来回移动施工装置,进一步提高施工效率。
Precast pile sinking construction method
The invention relates to a pile foundation construction technology, in particular to a precast pile sinking method which comprises bases, a rack and a pile planting device, the bases are located on the front side and the rear side of the rack, the bases are sliding rails, sliding grooves are formed in the sliding rails, first sliding motors are arranged on the two sides of the rack, the first sliding motors are in sliding connection with the sliding grooves, and the pile planting device is arranged on the rack. The drilling system is arranged to form a prefabricated pile hole in the pile sinking position in advance, so that pile sinking is completed more rapidly and stably during pile lifting, the situation that when the pile is hit and sunk, the lifted pile is prone to bursting or the sinking angle deviates, and consequently the pile is damaged is avoided, and the pile sinking efficiency is improved; and the drilling system and the hydraulic pile sinking system rotate on the equipment workbench through the pile planting platform to adjust different construction systems, so that the construction device is prevented from being moved back and forth when the construction device is replaced, and the construction efficiency is further improved.
本发明涉及桩基施工技术,具体为一种预制桩沉桩工法,包括基座、机架以及植桩装置,所述基座位于机架的前后两侧,所述基座为滑轨,所述滑轨上设有滑槽,所述机架的两侧设有第一滑动电机,所述第一滑动电机与滑槽滑动连接,所述机架的前后两侧均安装有第一液压机,本发明通过设置钻孔系统在沉桩位置处提前开设预制桩孔,从而使吊桩更加快速稳定的的完成沉桩,避免在击打沉桩时,吊桩容易爆碎或沉入角度出现偏差造成坏桩,从而提高沉桩效率,钻孔系统以及液压沉桩系统通过植桩平台在设备工作台上转动对不同的施工系统进行调节,从而避免再调换施工装置时来回移动施工装置,进一步提高施工效率。
Precast pile sinking construction method
一种预制桩沉桩工法
CHEN XIANJU (Autor:in) / CHEN GUOHUI (Autor:in) / HE WENSEN (Autor:in)
16.09.2022
Patent
Elektronische Ressource
Chinesisch
Pile sinking construction method for precast concrete plank pile
Europäisches Patentamt | 2016
|Pile sinking construction method for drilling and implanting precast pile
Europäisches Patentamt | 2023
|