Construction method for wind shaft horizontal protection platform in climbing frame construction system
The invention discloses a construction method for a wind shaft horizontal protection platform in a climbing frame construction system, and relates to the technical field of building construction. The construction method for the wind shaft horizontal protection platform in the climbing frame construction system comprises the following specific operation steps that S1, climbing frame walkway plates are arranged, climbing frame vertical rods are arranged between the climbing frame walkway plates on different layers, climbing frame vertical rod self-provided penetrating holes are formed in the climbing frame vertical rods, meanwhile, climbing frame turning plates are arranged, and the climbing frame vertical rods are arranged on the climbing frame turning plates in a penetrating mode. According to the construction method for the wind shaft horizontal protection platform in the climbing frame construction system, the checkered plates are fixed to the climbing frame vertical rods, meanwhile, the inclined pulling steel wire ropes are connected with the climbing frame walkway plates, the protection platform is formed, protection is stable and reliable, folding and unfolding are convenient, and actual operability and safety are enhanced.
本发明公开了一种用于爬架施工体系中风井水平防护平台的施工方法,涉及建筑施工技术领域。该用于爬架施工体系中风井水平防护平台的施工方法,具体操作如下:S1、设置爬架走道板,在不同层的爬架走道板之间设置爬架立杆,在爬架立杆上开设爬架立杆自带穿孔,同时设置爬架翻板,使得爬架立杆贯穿设置于爬架翻板上。该用于爬架施工体系中风井水平防护平台的施工方法,通过将花纹板与爬架立杆固定,同时通过斜拉钢丝绳与爬架走道板连接,形成防护平台,防护稳定可靠,收放方便,增强了实际可操作性和安全性。
Construction method for wind shaft horizontal protection platform in climbing frame construction system
The invention discloses a construction method for a wind shaft horizontal protection platform in a climbing frame construction system, and relates to the technical field of building construction. The construction method for the wind shaft horizontal protection platform in the climbing frame construction system comprises the following specific operation steps that S1, climbing frame walkway plates are arranged, climbing frame vertical rods are arranged between the climbing frame walkway plates on different layers, climbing frame vertical rod self-provided penetrating holes are formed in the climbing frame vertical rods, meanwhile, climbing frame turning plates are arranged, and the climbing frame vertical rods are arranged on the climbing frame turning plates in a penetrating mode. According to the construction method for the wind shaft horizontal protection platform in the climbing frame construction system, the checkered plates are fixed to the climbing frame vertical rods, meanwhile, the inclined pulling steel wire ropes are connected with the climbing frame walkway plates, the protection platform is formed, protection is stable and reliable, folding and unfolding are convenient, and actual operability and safety are enhanced.
本发明公开了一种用于爬架施工体系中风井水平防护平台的施工方法,涉及建筑施工技术领域。该用于爬架施工体系中风井水平防护平台的施工方法,具体操作如下:S1、设置爬架走道板,在不同层的爬架走道板之间设置爬架立杆,在爬架立杆上开设爬架立杆自带穿孔,同时设置爬架翻板,使得爬架立杆贯穿设置于爬架翻板上。该用于爬架施工体系中风井水平防护平台的施工方法,通过将花纹板与爬架立杆固定,同时通过斜拉钢丝绳与爬架走道板连接,形成防护平台,防护稳定可靠,收放方便,增强了实际可操作性和安全性。
Construction method for wind shaft horizontal protection platform in climbing frame construction system
一种用于爬架施工体系中风井水平防护平台的施工方法
JIANG JIWEI (Autor:in) / WANG WEILUN (Autor:in) / CHEN PENGTAO (Autor:in) / SHEN TIANBAO (Autor:in) / MA XIAOZHEN (Autor:in)
20.09.2022
Patent
Elektronische Ressource
Chinesisch
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Construction method of attached type automatic climbing elevator shaft safety protection platform
Europäisches Patentamt | 2022
|Construction platform and safety protection structure of electric hydraulic climbing frame
Europäisches Patentamt | 2022
Intelligent hydraulic self-climbing construction platform system for elevator shaft
Europäisches Patentamt | 2024
|Self-climbing construction system for elevator shaft construction engineering
Europäisches Patentamt | 2024
|