Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Fabricated embedded pipeline integrated wallboard preparation process and slurry formula
The invention discloses a preparation method of an assembly type embedded pipeline integrated wallboard, which comprises the following steps: S1) modeling the shape of a product according to customer requirements; (S2) the model prepared in the step (S1) is disassembled, and a wall body blank and a mesh are separated out; s3) preparing a mesh; s31): making a mesh main body frame; s32), according to actual requirements, positioning columns are placed; s33) placing the wiring assembly according to the position of the positioning column; s4, slurry needed by the wallboard is prepared, the wiring assembly can be fixed through the positioning columns, and it is guaranteed that the wiring assembly does not incline or deviate; the junction box and the wiring connecting pipe are directly connected in an inserted mode, the sealing performance is good, it is guaranteed that no slurry leakage phenomenon exists through the filled foam in the construction process, the junction box and the wiring connecting pipe are directly connected to the reinforcing mesh cage, fixation is firm, deflection and deformation are not prone to occurring, and great convenience is brought to follow-up threading or other construction.
本发明公开了一种装配式预埋管线一体化墙板制备方法,其步骤如下:S1):根据客户需求,对产品的形状进行建模;S2):将S1)制备的模型拆解,分离出墙体胚体和网片;S3):制备网片;S31):制做网片主体框架;S32):按照实际需求,放置定位柱的位置;S33):根据定位柱的位置放置接线组件;S4):制备墙板所需浆料,本发明可通过定位柱将所述接线组件进行固定,保证其无歪斜、或者出现偏移现象;所述接线盒和接线连接管直接插接不仅密封性好,而且在施工过程中填充的泡沫保证无漏浆现象,而且接线盒和接线连接管直接连接于钢筋网笼固定牢靠不易歪斜变形,对后续穿线或其他施工产生极大的便利性。
Fabricated embedded pipeline integrated wallboard preparation process and slurry formula
The invention discloses a preparation method of an assembly type embedded pipeline integrated wallboard, which comprises the following steps: S1) modeling the shape of a product according to customer requirements; (S2) the model prepared in the step (S1) is disassembled, and a wall body blank and a mesh are separated out; s3) preparing a mesh; s31): making a mesh main body frame; s32), according to actual requirements, positioning columns are placed; s33) placing the wiring assembly according to the position of the positioning column; s4, slurry needed by the wallboard is prepared, the wiring assembly can be fixed through the positioning columns, and it is guaranteed that the wiring assembly does not incline or deviate; the junction box and the wiring connecting pipe are directly connected in an inserted mode, the sealing performance is good, it is guaranteed that no slurry leakage phenomenon exists through the filled foam in the construction process, the junction box and the wiring connecting pipe are directly connected to the reinforcing mesh cage, fixation is firm, deflection and deformation are not prone to occurring, and great convenience is brought to follow-up threading or other construction.
本发明公开了一种装配式预埋管线一体化墙板制备方法,其步骤如下:S1):根据客户需求,对产品的形状进行建模;S2):将S1)制备的模型拆解,分离出墙体胚体和网片;S3):制备网片;S31):制做网片主体框架;S32):按照实际需求,放置定位柱的位置;S33):根据定位柱的位置放置接线组件;S4):制备墙板所需浆料,本发明可通过定位柱将所述接线组件进行固定,保证其无歪斜、或者出现偏移现象;所述接线盒和接线连接管直接插接不仅密封性好,而且在施工过程中填充的泡沫保证无漏浆现象,而且接线盒和接线连接管直接连接于钢筋网笼固定牢靠不易歪斜变形,对后续穿线或其他施工产生极大的便利性。
Fabricated embedded pipeline integrated wallboard preparation process and slurry formula
一种装配式预埋管线一体化墙板制备工艺及浆料的配方
LIU MINGLIANG (Autor:in) / WANG YAMING (Autor:in) / LI DANDAN (Autor:in) / GAO JINQI (Autor:in) / WANG ZHENXING (Autor:in) / LIU DI (Autor:in)
27.09.2022
Patent
Elektronische Ressource
Chinesisch
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
/
C04B
Kalk
,
LIME
/
E04C
STRUCTURAL ELEMENTS
,
Bauelemente
/
H02G
INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
,
Verlegen oder Installieren elektrischer Kabel oder Leitungen, Verlegen oder Installieren kombinierter optischer und elektrischer Kabel oder Leitungen
Fabricated wallboard structure of integrated circuit pipeline
Europäisches Patentamt | 2021
|Fabricated wallboard, continuous fabricated wallboard and continuous production process
Europäisches Patentamt | 2021
|Europäisches Patentamt | 2023
|Europäisches Patentamt | 2024
|