Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Construction method of turnover type bridge high pier combined formwork
The invention discloses a construction method of a turnover type bridge high pier combined template, which is characterized in that a template body, a plurality of I-shaped wood beams and a plurality of transverse back ridges are spliced to form the combined template, a tripod platform, an operation platform frame body and the combined template are convenient to disassemble and assemble, the high-altitude assembly construction efficiency on the tripod platform is improved, the risk caused by high-altitude assembly is reduced, and the construction period is shortened. The embedded part assembly is convenient to assemble through the tension hole formed in the combined template, and the combined template is convenient to quickly disassemble after the embedded part assembly and the pouring concrete of the pier body are integrally hardened, so that the hardened embedded part assembly is used for locking and mounting the tripod platform, quick upward moving and mounting of the tripod platform are realized, and the construction efficiency is improved. When the pier body is constructed, the tripod platform can be lifted, the platform frame body can be operated, and the combined template can be turned and lifted to enter the previous layer circulation until the construction of the whole pier body is completed, so that the construction period can be shortened.
本发明公开了一种翻模式桥高墩组合模板的施工方法,通过模板本体、多个工字型木梁和多个横向背楞拼装成组合模板,三角架平台、操作平台架体和组合模板拆装方便,提高三角架平台上高空组配施工效率,降低高空作业组装带来的风险,组合模板上开设的拉力孔便于装配埋件总成,埋件总成与墩身的浇筑砼一体硬化后,便于快速拆卸组合模板,从而使得硬化的埋件总成用于三角架平台的锁定安装使用,实现三角架平台快速上移安装,可以上移提升三角架平台、操作平台架体和翻升组合模板,进入上一节层循环,直至完成全部墩身施工,有助于缩短施工周期。
Construction method of turnover type bridge high pier combined formwork
The invention discloses a construction method of a turnover type bridge high pier combined template, which is characterized in that a template body, a plurality of I-shaped wood beams and a plurality of transverse back ridges are spliced to form the combined template, a tripod platform, an operation platform frame body and the combined template are convenient to disassemble and assemble, the high-altitude assembly construction efficiency on the tripod platform is improved, the risk caused by high-altitude assembly is reduced, and the construction period is shortened. The embedded part assembly is convenient to assemble through the tension hole formed in the combined template, and the combined template is convenient to quickly disassemble after the embedded part assembly and the pouring concrete of the pier body are integrally hardened, so that the hardened embedded part assembly is used for locking and mounting the tripod platform, quick upward moving and mounting of the tripod platform are realized, and the construction efficiency is improved. When the pier body is constructed, the tripod platform can be lifted, the platform frame body can be operated, and the combined template can be turned and lifted to enter the previous layer circulation until the construction of the whole pier body is completed, so that the construction period can be shortened.
本发明公开了一种翻模式桥高墩组合模板的施工方法,通过模板本体、多个工字型木梁和多个横向背楞拼装成组合模板,三角架平台、操作平台架体和组合模板拆装方便,提高三角架平台上高空组配施工效率,降低高空作业组装带来的风险,组合模板上开设的拉力孔便于装配埋件总成,埋件总成与墩身的浇筑砼一体硬化后,便于快速拆卸组合模板,从而使得硬化的埋件总成用于三角架平台的锁定安装使用,实现三角架平台快速上移安装,可以上移提升三角架平台、操作平台架体和翻升组合模板,进入上一节层循环,直至完成全部墩身施工,有助于缩短施工周期。
Construction method of turnover type bridge high pier combined formwork
一种翻模式桥高墩组合模板的施工方法
LIU ZUNYUN (Autor:in) / GUO QINGJIAN (Autor:in) / DENG ZILI (Autor:in) / LIN WEIZHE (Autor:in) / XIE FENGZE (Autor:in) / WU LIANGMU (Autor:in) / LI PINGBIN (Autor:in) / LIU DAN (Autor:in) / PAN WEI (Autor:in) / HUA PINGLI (Autor:in)
30.09.2022
Patent
Elektronische Ressource
Chinesisch
Formwork and construction method for bridge formwork turnover pier column construction
Europäisches Patentamt | 2023
|Formwork removal method for bridge pier column formwork turnover construction
Europäisches Patentamt | 2024
|Urban high-pier support-free formwork turnover construction method
Europäisches Patentamt | 2015
|Square pier construction formwork turnover device and construction method thereof
Europäisches Patentamt | 2023
|WALKING-TYPE BRIDGE THIN-WALL PIER HIGH-PIER JACKING FORMWORK AND CONSTRUCTION METHOD THEREFOR
Europäisches Patentamt | 2023
|