Existing road transverse construction and road recovery method
The invention provides an existing road transverse construction and road recovery method which comprises the steps that hardening of an expanded area is completed, and meanwhile construction of a to-be-constructed area on one side of a non-expanded area is completed; the temporary municipal roads on the side far away from the expansion area are merged to the original municipal roads on the side close to the expansion area, the temporary municipal roads on the side close to the expansion area are merged to the expansion area, and construction of the original municipal road to-be-constructed area on the side far away from the expansion area is completed; the original municipal road away from one side of the expansion area is recovered, and construction of the to-be-constructed area of the original municipal road close to one side of the expansion area is completed; the original municipal road close to one side of the expansion area is recovered, the expansion area is dismantled, and follow-up construction is completed. The method has the characteristics of short construction period, small influence range, low manufacturing cost and the like.
本发明提供一种现有道路横向施工与道路恢复方法,包括:完成拓展区域的硬化,同时完成非拓展区域一侧拟施工区域的施工;将远离拓展区域一侧的临时市政道路并线至靠近拓展区域一侧的原有市政道路,靠近拓展区域一侧的临时市政道路并线至拓展区域,完成远离拓展区域一侧的原有市政道路拟施工区域的施工;恢复远离拓展区域一侧的原有市政道路,完成靠近拓展区域一侧的原有市政道路位置拟施工区域的施工;恢复靠近拓展区域一侧的原有市政道路,拆除拓展区域,完成后续施工。本发明具有施工周期短,影响范围小,造价成本低等特点。
Existing road transverse construction and road recovery method
The invention provides an existing road transverse construction and road recovery method which comprises the steps that hardening of an expanded area is completed, and meanwhile construction of a to-be-constructed area on one side of a non-expanded area is completed; the temporary municipal roads on the side far away from the expansion area are merged to the original municipal roads on the side close to the expansion area, the temporary municipal roads on the side close to the expansion area are merged to the expansion area, and construction of the original municipal road to-be-constructed area on the side far away from the expansion area is completed; the original municipal road away from one side of the expansion area is recovered, and construction of the to-be-constructed area of the original municipal road close to one side of the expansion area is completed; the original municipal road close to one side of the expansion area is recovered, the expansion area is dismantled, and follow-up construction is completed. The method has the characteristics of short construction period, small influence range, low manufacturing cost and the like.
本发明提供一种现有道路横向施工与道路恢复方法,包括:完成拓展区域的硬化,同时完成非拓展区域一侧拟施工区域的施工;将远离拓展区域一侧的临时市政道路并线至靠近拓展区域一侧的原有市政道路,靠近拓展区域一侧的临时市政道路并线至拓展区域,完成远离拓展区域一侧的原有市政道路拟施工区域的施工;恢复远离拓展区域一侧的原有市政道路,完成靠近拓展区域一侧的原有市政道路位置拟施工区域的施工;恢复靠近拓展区域一侧的原有市政道路,拆除拓展区域,完成后续施工。本发明具有施工周期短,影响范围小,造价成本低等特点。
Existing road transverse construction and road recovery method
一种现有道路横向施工与道路恢复方法
ZENG YINSHENG (Autor:in) / SHI JINYAN (Autor:in) / QIAN FUJIAN (Autor:in) / QUAN YOUWEI (Autor:in) / ZHOU WEI (Autor:in) / LIN HAI (Autor:in) / NIU FENG (Autor:in) / LIU YASONG (Autor:in) / PAN GENGYI (Autor:in)
11.10.2022
Patent
Elektronische Ressource
Chinesisch
IPC:
E01C
Bau von Straßen, Sportplätzen oder dgl., Decken dafür
,
CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE
Excavation construction method for high road cutting beside existing road
Europäisches Patentamt | 2020
|Fixing device crossing existing road and construction method
Europäisches Patentamt | 2023
|Asphalt road based on thermal power plant existing road and construction method thereof
Europäisches Patentamt | 2021
|Construction method of fore shaft adjacent to existing road
Europäisches Patentamt | 2023
|