Construction method and construction equipment for water conservancy dike
The invention discloses a construction method and construction equipment for a water conservancy dike. The construction method comprises the following steps that S10, dredged soil is obtained through a dredger (110), and cement paste is prepared through a cement mixer; s20, the prepared cement paste and the dredged soil are stirred and blended according to a certain proportion to form cement soil; and S30, cement soil is conveyed to the water conservancy dike (200), and layered filling and pouring are adopted. The dredged soil is used as an engineering raw material, so that the dredged soil resource which is seriously wasted at present is utilized, and precious land resources are saved; environmental pollution caused by the fact that dredged soil is thrown to other water areas is avoided, and contribution is made to environmental protection; due to the fact that the water conservancy embankment project and the dredging project are generally not far away from each other, the purpose of using local materials can be achieved almost through the mature pipeline pumping technology, and a large amount of labor cost and transportation cost are saved.
本发明公开了一种水利堤防的施工方法和施工设备,施工方法包括如下步骤:S10:利用挖泥船(110)获取疏浚土、采用水泥搅拌机配制水泥浆;S20:将配置好的水泥浆与疏浚土按照一定的比例进行搅拌调制形成水泥土;S30:将水泥土输送至水利堤防(200)上采用分层式填充浇筑。本发明使用疏浚土作为工程原材料,既利用了目前浪费严重的疏浚土资源,又节省了宝贵的土地资源;避免了疏浚土被外抛至其他水域从而导致环境污染,为环境保护作出了贡献;由于水利堤防工程与疏浚工程一般距离不会相隔很远,通过较为成熟的管道泵送技术几乎可以实现“就地取材”,节省了大量的劳动力成本和运输成本。
Construction method and construction equipment for water conservancy dike
The invention discloses a construction method and construction equipment for a water conservancy dike. The construction method comprises the following steps that S10, dredged soil is obtained through a dredger (110), and cement paste is prepared through a cement mixer; s20, the prepared cement paste and the dredged soil are stirred and blended according to a certain proportion to form cement soil; and S30, cement soil is conveyed to the water conservancy dike (200), and layered filling and pouring are adopted. The dredged soil is used as an engineering raw material, so that the dredged soil resource which is seriously wasted at present is utilized, and precious land resources are saved; environmental pollution caused by the fact that dredged soil is thrown to other water areas is avoided, and contribution is made to environmental protection; due to the fact that the water conservancy embankment project and the dredging project are generally not far away from each other, the purpose of using local materials can be achieved almost through the mature pipeline pumping technology, and a large amount of labor cost and transportation cost are saved.
本发明公开了一种水利堤防的施工方法和施工设备,施工方法包括如下步骤:S10:利用挖泥船(110)获取疏浚土、采用水泥搅拌机配制水泥浆;S20:将配置好的水泥浆与疏浚土按照一定的比例进行搅拌调制形成水泥土;S30:将水泥土输送至水利堤防(200)上采用分层式填充浇筑。本发明使用疏浚土作为工程原材料,既利用了目前浪费严重的疏浚土资源,又节省了宝贵的土地资源;避免了疏浚土被外抛至其他水域从而导致环境污染,为环境保护作出了贡献;由于水利堤防工程与疏浚工程一般距离不会相隔很远,通过较为成熟的管道泵送技术几乎可以实现“就地取材”,节省了大量的劳动力成本和运输成本。
Construction method and construction equipment for water conservancy dike
一种水利堤防的施工方法和施工设备
WANG JUN (Autor:in) / CHEN JUNJIE (Autor:in) / YIU CANDY (Autor:in) / GAO XIAOHUI (Autor:in) / WU JINGYUN (Autor:in) / SHI HAN (Autor:in) / LIU HAO (Autor:in) / CHU FANGZHOU (Autor:in) / DING JINGHU (Autor:in) / HUANG ZHENG (Autor:in)
18.10.2022
Patent
Elektronische Ressource
Chinesisch
Concrete pouring equipment for water conservancy dike engineering construction
Europäisches Patentamt | 2021
|Rapidly constructed water conservancy dike slope protection structure and construction method
Europäisches Patentamt | 2024
|Rapid blocking device for dike breach in water conservancy project construction
Europäisches Patentamt | 2021
|Water conservancy dike integrated propaganda platform
Europäisches Patentamt | 2023
|Water conservancy dam construction equipment and construction method
Europäisches Patentamt | 2024
|