Water conservancy dam construction equipment and construction method
The invention discloses water conservancy dam construction equipment and a construction method, and belongs to the technical field of water conservancy projects. The water conservancy dam construction equipment comprises a sliding formwork, a traction part, a fixed supporting table, a movable supporting table and a bearing part, the traction part is used for pulling the sliding formwork to the dam top or lowering the sliding formwork to the dam bottom, the water conservancy dam construction equipment is characterized in that the sliding formwork is configured to be in a working state and a standby state, in the working state, the sliding formwork is located at the dam top, and in the standby state, the sliding formwork is located at the dam bottom; in a standby state, the sliding formwork is located on the surface of a dam slope and fixedly connected to the dam crest, a sliding rail is arranged on the fixed supporting table and arranged in the length direction of a dam body, the movable supporting table is slidably connected to the sliding rail, the traction part is fixedly connected to the movable supporting table, and the bearing part comprises a first bearing mechanism and a second bearing mechanism. The first bearing mechanism is arranged on the slip form (1), the second bearing mechanism is arranged on the movable supporting table (4), and the first bearing mechanism can be borne on the second bearing mechanism through the traction part (2), or the first bearing mechanism is separated from the second bearing mechanism, so that the slip form (2) is switched between a standby state and a working state. According to the water conservancy dam construction equipment and the construction method, after pouring of one concrete panel is completed, the slip form can be rapidly installed to the position of the panel needing to be poured after downward moving, and the construction efficiency of a water conservancy dam is greatly improved.
本发明公开了一种水利堤坝施工设备及施工方法,属于水利工程技术领域。该水利堤坝施工设备及施工方法包括滑模、牵引部、固定支撑台、活动支撑台和承接部,牵引部用于将滑模向坝顶牵引或将滑模向坝底下放,其特征在于,滑模被配置为工作状态和待机状态两种状态,其中,在工作状态下,滑模位于坝顶,在待机状态下,滑模位于坝坡表面上,固定连接于坝顶,固定支撑台上设有滑轨,滑轨沿坝体的长度方向设置,活动支撑台,滑动连接于滑轨上,牵引部固定连接于活动支撑台上,承接部,包括第一承接机构和第二承接机构,所述第一承接机构设于所述所述滑模(1)上,所述第二承接机构设于所述活动支撑台(4)上,通过牵引部(2)能够使所述第一承接机构被承接在第二承接机构上,或第一承接机构与第二承接机构脱离,以使滑模(2)在待机状态和工作状态之间切换。本发明的水利堤坝施工设备及施工方法能够在完成一块混凝土面板的浇筑后,快速地将滑模安装至下移需要浇筑的面板处,极大地提高水利堤坝的施工效率。
Water conservancy dam construction equipment and construction method
The invention discloses water conservancy dam construction equipment and a construction method, and belongs to the technical field of water conservancy projects. The water conservancy dam construction equipment comprises a sliding formwork, a traction part, a fixed supporting table, a movable supporting table and a bearing part, the traction part is used for pulling the sliding formwork to the dam top or lowering the sliding formwork to the dam bottom, the water conservancy dam construction equipment is characterized in that the sliding formwork is configured to be in a working state and a standby state, in the working state, the sliding formwork is located at the dam top, and in the standby state, the sliding formwork is located at the dam bottom; in a standby state, the sliding formwork is located on the surface of a dam slope and fixedly connected to the dam crest, a sliding rail is arranged on the fixed supporting table and arranged in the length direction of a dam body, the movable supporting table is slidably connected to the sliding rail, the traction part is fixedly connected to the movable supporting table, and the bearing part comprises a first bearing mechanism and a second bearing mechanism. The first bearing mechanism is arranged on the slip form (1), the second bearing mechanism is arranged on the movable supporting table (4), and the first bearing mechanism can be borne on the second bearing mechanism through the traction part (2), or the first bearing mechanism is separated from the second bearing mechanism, so that the slip form (2) is switched between a standby state and a working state. According to the water conservancy dam construction equipment and the construction method, after pouring of one concrete panel is completed, the slip form can be rapidly installed to the position of the panel needing to be poured after downward moving, and the construction efficiency of a water conservancy dam is greatly improved.
本发明公开了一种水利堤坝施工设备及施工方法,属于水利工程技术领域。该水利堤坝施工设备及施工方法包括滑模、牵引部、固定支撑台、活动支撑台和承接部,牵引部用于将滑模向坝顶牵引或将滑模向坝底下放,其特征在于,滑模被配置为工作状态和待机状态两种状态,其中,在工作状态下,滑模位于坝顶,在待机状态下,滑模位于坝坡表面上,固定连接于坝顶,固定支撑台上设有滑轨,滑轨沿坝体的长度方向设置,活动支撑台,滑动连接于滑轨上,牵引部固定连接于活动支撑台上,承接部,包括第一承接机构和第二承接机构,所述第一承接机构设于所述所述滑模(1)上,所述第二承接机构设于所述活动支撑台(4)上,通过牵引部(2)能够使所述第一承接机构被承接在第二承接机构上,或第一承接机构与第二承接机构脱离,以使滑模(2)在待机状态和工作状态之间切换。本发明的水利堤坝施工设备及施工方法能够在完成一块混凝土面板的浇筑后,快速地将滑模安装至下移需要浇筑的面板处,极大地提高水利堤坝的施工效率。
Water conservancy dam construction equipment and construction method
水利堤坝施工设备及施工方法
LI YULIANG (Autor:in) / ZHANG WENHAO (Autor:in) / CHEN JIAN (Autor:in)
14.05.2024
Patent
Elektronische Ressource
Chinesisch
Construction method and construction equipment for water conservancy dike
Europäisches Patentamt | 2022
|