Rail collecting and replacing operation system and operation method
The embodiment of the invention provides a rail collecting and replacing operation system. The rail collecting and replacing operation system comprises a front trolley and a rear trolley. The front trolley is used for bearing a new track, guiding the new track into a target mounting position, bearing an old track and conveying the old track to external equipment; the rear trolley is used for bearing the old track, guiding the old track to a track center or a ballast shoulder and conveying the old track to the front trolley; rail replacement and recovery operation can be flexibly carried out according to actual conditions, skylight time is fully utilized, rail replacement mechanization is achieved, operation pressure of constructors is relieved, construction efficiency is improved, a front trolley directly guides a new rail into a target installation position, and an old rail can be guided to a rail center and can also be guided to a ballast shoulder to prevent interference and collision of the new rail and the old rail.
本申请的实施例提供一种收换轨作业系统,包括前小车及后小车;前小车用于承载新轨道并将新轨道导入目标安装位置,以及承载旧轨道并将旧轨道输送至外部设备;后小车用于承载旧轨道并将旧轨道导出至轨道道心或砟肩,以及将旧轨道输送至前小车;能够根据实际情况灵活进行轨道更换和回收作业,充分利用天窗时间,实现换轨机械化,减轻施工人员作业压力,提高施工效率,前小车将新轨道直接导入目标安装位置,旧轨道既可以导至道心也可以导至砟肩防止新旧轨道干涉擦碰。
Rail collecting and replacing operation system and operation method
The embodiment of the invention provides a rail collecting and replacing operation system. The rail collecting and replacing operation system comprises a front trolley and a rear trolley. The front trolley is used for bearing a new track, guiding the new track into a target mounting position, bearing an old track and conveying the old track to external equipment; the rear trolley is used for bearing the old track, guiding the old track to a track center or a ballast shoulder and conveying the old track to the front trolley; rail replacement and recovery operation can be flexibly carried out according to actual conditions, skylight time is fully utilized, rail replacement mechanization is achieved, operation pressure of constructors is relieved, construction efficiency is improved, a front trolley directly guides a new rail into a target installation position, and an old rail can be guided to a rail center and can also be guided to a ballast shoulder to prevent interference and collision of the new rail and the old rail.
本申请的实施例提供一种收换轨作业系统,包括前小车及后小车;前小车用于承载新轨道并将新轨道导入目标安装位置,以及承载旧轨道并将旧轨道输送至外部设备;后小车用于承载旧轨道并将旧轨道导出至轨道道心或砟肩,以及将旧轨道输送至前小车;能够根据实际情况灵活进行轨道更换和回收作业,充分利用天窗时间,实现换轨机械化,减轻施工人员作业压力,提高施工效率,前小车将新轨道直接导入目标安装位置,旧轨道既可以导至道心也可以导至砟肩防止新旧轨道干涉擦碰。
Rail collecting and replacing operation system and operation method
收换轨作业系统及作业方法
TAO XIAOHU (Autor:in) / TANG MINGMING (Autor:in) / CHEN YUESHUN (Autor:in) / CHEN QINYUN (Autor:in) / WU YUXIANG (Autor:in) / ZHANG ZHIJIAN (Autor:in) / HUANG QIONGYA (Autor:in)
01.11.2022
Patent
Elektronische Ressource
Chinesisch
IPC:
E01B
PERMANENT WAY
,
Gleisoberbau
Rail collecting and replacing operation system with hoisting function and operation method
Europäisches Patentamt | 2022
|Large rail piece laying and replacing operation system
Europäisches Patentamt | 2023
|Urban rail transit steel rail overhauling and replacing operation train
Europäisches Patentamt | 2024
|Subway rail collecting and replacing equipment and method
Europäisches Patentamt | 2024
|Track large rail piece laying and replacing operation method
Europäisches Patentamt | 2023
|