Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Large rail piece laying and replacing operation system
The invention discloses a large rail piece laying and replacing operation system for a rail. The large rail piece laying and replacing operation system comprises a rail car, a first transport flatcar and a second transport flatcar which are grouped and coupled. The at least two gantry crane devices are transversely placed on the first transport flatcar in a folding manner in a transport state; the retracting and releasing device is arranged on the first transport flatcar or the second transport flatcar and can realize placement or retraction of the gantry crane device through a turnover structure; and in the placing operation state, the gantry crane device is conveyed to a designated position through a longitudinal moving guide rail arranged on the first transport flatcar, is clamped and overturned by the retracting and releasing device, and is placed on a line after extending to a normal state. The technical problems that an existing large rail part replacing device is complex in structure and operation, high in cost and limited in space utilization can be solved.
本申请公开了一种轨道大轨件铺换作业系统,包括:编组连挂的轨道车、第一运输平车及第二运输平车;在运输状态下以折叠方式横向放置于第一运输平车上,不少于两个的门吊装置;设置于第一运输平车或第二运输平车上,可通过翻转式结构实现门吊装置放置或回收的收放装置;在放置作业状态下,门吊装置通过设置于第一运输平车上的纵移导轨输送至指定的位置,并由收放装置夹持、翻转,门吊装置在伸展至正常状态后再放置于线路上。本申请能解决现有轨道大轨件更换设备结构和操作复杂,成本较高,空间利用受限的技术问题。
Large rail piece laying and replacing operation system
The invention discloses a large rail piece laying and replacing operation system for a rail. The large rail piece laying and replacing operation system comprises a rail car, a first transport flatcar and a second transport flatcar which are grouped and coupled. The at least two gantry crane devices are transversely placed on the first transport flatcar in a folding manner in a transport state; the retracting and releasing device is arranged on the first transport flatcar or the second transport flatcar and can realize placement or retraction of the gantry crane device through a turnover structure; and in the placing operation state, the gantry crane device is conveyed to a designated position through a longitudinal moving guide rail arranged on the first transport flatcar, is clamped and overturned by the retracting and releasing device, and is placed on a line after extending to a normal state. The technical problems that an existing large rail part replacing device is complex in structure and operation, high in cost and limited in space utilization can be solved.
本申请公开了一种轨道大轨件铺换作业系统,包括:编组连挂的轨道车、第一运输平车及第二运输平车;在运输状态下以折叠方式横向放置于第一运输平车上,不少于两个的门吊装置;设置于第一运输平车或第二运输平车上,可通过翻转式结构实现门吊装置放置或回收的收放装置;在放置作业状态下,门吊装置通过设置于第一运输平车上的纵移导轨输送至指定的位置,并由收放装置夹持、翻转,门吊装置在伸展至正常状态后再放置于线路上。本申请能解决现有轨道大轨件更换设备结构和操作复杂,成本较高,空间利用受限的技术问题。
Large rail piece laying and replacing operation system
一种轨道大轨件铺换作业系统
CHEN LIANGPEI (Autor:in) / LI SHIPING (Autor:in) / YAN HONGWEN (Autor:in)
30.05.2023
Patent
Elektronische Ressource
Chinesisch
Track large rail piece laying and replacing operation method
Europäisches Patentamt | 2023
|Rail component laying, replacing and hoisting device and operation method thereof
Europäisches Patentamt | 2022
|Railway turnout laying and replacing operation system and operation method
Europäisches Patentamt | 2021
|Rail collecting and replacing operation system and operation method
Europäisches Patentamt | 2022
|