Construction method for underneath pass of high-speed bridge
The invention discloses an underpass high-speed bridge construction method which comprises the following steps: S1, leveling a bridge construction site, backfilling a pond in the bridge construction site to form a working surface, and reinforcing existing structures around a bridge; s2, cast-in-situ bored pile construction is conducted on the working face; s3, after construction of the cast-in-situ bored pile is completed, construction of a ground tie beam is conducted; s4, after construction of the ground tie beam is completed, construction of a pier column is conducted; s5, after construction of the pier columns is completed, construction of top straining beams is conducted in sequence; and S6, after construction of the top straining beam is completed, cast-in-place box girder construction is conducted. The invention provides a construction method for underneath passing a high-speed bridge. The construction safety and quality are guaranteed.
本发明公开下穿高速桥梁施工方法,包括以下步骤:S1、对桥梁施工场地进行平整,回填桥梁施工场地内的水塘,形成工作面,同时对桥梁周边既有构筑物补强处治;S2、在工作面上进行钻孔灌注桩施工;S3、钻孔灌注桩施工完成后,进行地系梁的施工;S4、地系梁的施工完成后,进行墩柱的施工;S5、墩柱的施工完成后,依次进行顶系梁的施工;S6、顶系梁的施工完成后,进行现浇箱梁施工。本发明提供一种下穿高速桥梁施工方法,保施工安全与质量。
Construction method for underneath pass of high-speed bridge
The invention discloses an underpass high-speed bridge construction method which comprises the following steps: S1, leveling a bridge construction site, backfilling a pond in the bridge construction site to form a working surface, and reinforcing existing structures around a bridge; s2, cast-in-situ bored pile construction is conducted on the working face; s3, after construction of the cast-in-situ bored pile is completed, construction of a ground tie beam is conducted; s4, after construction of the ground tie beam is completed, construction of a pier column is conducted; s5, after construction of the pier columns is completed, construction of top straining beams is conducted in sequence; and S6, after construction of the top straining beam is completed, cast-in-place box girder construction is conducted. The invention provides a construction method for underneath passing a high-speed bridge. The construction safety and quality are guaranteed.
本发明公开下穿高速桥梁施工方法,包括以下步骤:S1、对桥梁施工场地进行平整,回填桥梁施工场地内的水塘,形成工作面,同时对桥梁周边既有构筑物补强处治;S2、在工作面上进行钻孔灌注桩施工;S3、钻孔灌注桩施工完成后,进行地系梁的施工;S4、地系梁的施工完成后,进行墩柱的施工;S5、墩柱的施工完成后,依次进行顶系梁的施工;S6、顶系梁的施工完成后,进行现浇箱梁施工。本发明提供一种下穿高速桥梁施工方法,保施工安全与质量。
Construction method for underneath pass of high-speed bridge
一种下穿高速桥梁施工方法
YIN HONGLIANG (Autor:in) / WEN LIANGDONG (Autor:in) / WU GUOQING (Autor:in) / QIAN LIANG (Autor:in) / ZHANG WENBO (Autor:in) / LU ZHIHENG (Autor:in)
04.11.2022
Patent
Elektronische Ressource
Chinesisch
Construction method for constructing gateway in limited space of underneath pass bridge
Europäisches Patentamt | 2024
|Reinforcing structure for construction of existing railway underneath pass frame bridge
Europäisches Patentamt | 2021
|Bridge cushion cap force underpinning technology in underneath pass open trench tunnel construction
Europäisches Patentamt | 2015
|Land prefabricated immersed tube underneath pass tunnel construction method
Europäisches Patentamt | 2023
|