Construction method for constructing gateway in limited space of underneath pass bridge
The invention provides a construction method for constructing a gateway in a limited space of an underpass bridge. The construction method comprises the following steps: S1, setting a proper construction position; s2, marking a routing path, a construction starting point and a construction ending point of the gateway; s3, construction of a first cast-in-place pile is conducted; s4, the first cast-in-place piles on the two sides are connected and fixed through a positioning frame; s5, the first digging pits and the second digging pits are dug, and meanwhile the second digging pits are formed in the two sides of the direction of the gateway; s6, construction of a third digging pit is conducted at the same time, and the first digging pit, the second digging pit and the third digging pit are arranged in a stepped mode; s7, excavation is continued; s8, circulating the steps S3-S6 until a second foundation pit body is formed; s9, construction of a third cast-in-place pile is completed; s10, forming a first communicating foundation pit; s11, the steps S3-S10 are repeated until the second communication foundation pit and the continuous row cast-in-place piles are completed; and S12, formwork erecting, pouring and filling are conducted, and a design target pit is formed. Construction is efficient, the overall construction efficiency can be greatly improved, and operation safety is guaranteed.
本发明提供一种下穿桥梁的有限空间内施工闸道的施工方法,包括以下步骤:S1、设置合适的施工位置;S2、标记出闸道的走线路径、施工起点和终点;S3、进行第一灌注桩的施工;S4、两侧的第一灌注桩通过定位架连接固定;S5、开挖第一开挖坑和第二开挖坑,同时在沿闸道的走向两侧设置第二开挖坑;S6、同时进行第三开挖坑的施工,第一开挖坑、第二开挖坑和第三开挖坑成阶梯设置;S7、继续开挖;S8、循环S3~S6,直至形成第二基坑体;S9、完成第三灌注桩的施工;S10、形成第一连通基坑;S11、重复S3~S10,直至完成第二连通基坑和连排灌注桩;S12、立模浇筑填充,形成设计目标坑。本发明施工高效,能大幅度提高整体的施工效率,保证作业安全。
Construction method for constructing gateway in limited space of underneath pass bridge
The invention provides a construction method for constructing a gateway in a limited space of an underpass bridge. The construction method comprises the following steps: S1, setting a proper construction position; s2, marking a routing path, a construction starting point and a construction ending point of the gateway; s3, construction of a first cast-in-place pile is conducted; s4, the first cast-in-place piles on the two sides are connected and fixed through a positioning frame; s5, the first digging pits and the second digging pits are dug, and meanwhile the second digging pits are formed in the two sides of the direction of the gateway; s6, construction of a third digging pit is conducted at the same time, and the first digging pit, the second digging pit and the third digging pit are arranged in a stepped mode; s7, excavation is continued; s8, circulating the steps S3-S6 until a second foundation pit body is formed; s9, construction of a third cast-in-place pile is completed; s10, forming a first communicating foundation pit; s11, the steps S3-S10 are repeated until the second communication foundation pit and the continuous row cast-in-place piles are completed; and S12, formwork erecting, pouring and filling are conducted, and a design target pit is formed. Construction is efficient, the overall construction efficiency can be greatly improved, and operation safety is guaranteed.
本发明提供一种下穿桥梁的有限空间内施工闸道的施工方法,包括以下步骤:S1、设置合适的施工位置;S2、标记出闸道的走线路径、施工起点和终点;S3、进行第一灌注桩的施工;S4、两侧的第一灌注桩通过定位架连接固定;S5、开挖第一开挖坑和第二开挖坑,同时在沿闸道的走向两侧设置第二开挖坑;S6、同时进行第三开挖坑的施工,第一开挖坑、第二开挖坑和第三开挖坑成阶梯设置;S7、继续开挖;S8、循环S3~S6,直至形成第二基坑体;S9、完成第三灌注桩的施工;S10、形成第一连通基坑;S11、重复S3~S10,直至完成第二连通基坑和连排灌注桩;S12、立模浇筑填充,形成设计目标坑。本发明施工高效,能大幅度提高整体的施工效率,保证作业安全。
Construction method for constructing gateway in limited space of underneath pass bridge
下穿桥梁的有限空间内施工闸道的施工方法
HUANG WEI (Autor:in) / WANG ZHIMIN (Autor:in) / LIU WEN (Autor:in) / YANG RUI (Autor:in) / JIANG HUADONG (Autor:in) / ZHANG LIXIANG (Autor:in) / XU ZHUO (Autor:in) / YANG TAO (Autor:in) / ZHAO ZICHEN (Autor:in) / MA JINCHUAN (Autor:in)
12.01.2024
Patent
Elektronische Ressource
Chinesisch
CONSTRUCTION METHOD FOR CONSTRUCTING GATEWAY IN LIMITED SPACE UNDERNEATH BRIDGE
Europäisches Patentamt | 2024
|Construction method for underneath pass of high-speed bridge
Europäisches Patentamt | 2022
|Reinforcing structure for construction of existing railway underneath pass frame bridge
Europäisches Patentamt | 2021
|Europäisches Patentamt | 2024
|