Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Inspection well maintenance and reinforcement and road structure layer layering synchronous construction structure
The invention relates to a synchronous construction structure for maintenance and reinforcement of an inspection well and layering of a road structure layer, the road structure layer comprises a soil body layer, a roadbed layer and an asphalt layer which are distributed from bottom to top, the synchronous construction structure comprises a chassis, and a lifting plate is movably arranged on the chassis through a deflection mechanism; the deflection mechanism is further connected with a lifting mechanism installed on the chassis, a pressing plate is movably arranged on the lifting plate through a lifting mechanism, the pressing plate is arranged in an arc shape, the lifting mechanism is connected with a discontinuous triggering mechanism, and finally, the effective compaction function of the pressing plate on the peripheral structural layer of the shaft is achieved, so that the shaft can be effectively compacted. And it is ensured that the shaft can be flush with the layering, manual operation of workers is not needed, construction synchronism is achieved, and the construction efficiency is remarkably improved.
本发明涉及一种检查井维修加固与道路结构层分层同步施工结构,所述道路结构层包括由下至上分布的土体层、路基层和沥青层,所述同步施工结构包括底盘,所述底盘上通过偏转机构活动设置有升降板,且所述偏转机构还连接有安装在所述底盘上的升降机构,所述升降板上通过抬升机构活动设置有一个压板,所述压板呈弧形状设置,所述抬升机构连接有间断触发机构,最终,实现压板对井筒外围结构层有效的压实功能,从而,确保了井筒能够与分层保持齐平,且无需工作人员手动操作,实现施工同步性,显著提升施工效率。
Inspection well maintenance and reinforcement and road structure layer layering synchronous construction structure
The invention relates to a synchronous construction structure for maintenance and reinforcement of an inspection well and layering of a road structure layer, the road structure layer comprises a soil body layer, a roadbed layer and an asphalt layer which are distributed from bottom to top, the synchronous construction structure comprises a chassis, and a lifting plate is movably arranged on the chassis through a deflection mechanism; the deflection mechanism is further connected with a lifting mechanism installed on the chassis, a pressing plate is movably arranged on the lifting plate through a lifting mechanism, the pressing plate is arranged in an arc shape, the lifting mechanism is connected with a discontinuous triggering mechanism, and finally, the effective compaction function of the pressing plate on the peripheral structural layer of the shaft is achieved, so that the shaft can be effectively compacted. And it is ensured that the shaft can be flush with the layering, manual operation of workers is not needed, construction synchronism is achieved, and the construction efficiency is remarkably improved.
本发明涉及一种检查井维修加固与道路结构层分层同步施工结构,所述道路结构层包括由下至上分布的土体层、路基层和沥青层,所述同步施工结构包括底盘,所述底盘上通过偏转机构活动设置有升降板,且所述偏转机构还连接有安装在所述底盘上的升降机构,所述升降板上通过抬升机构活动设置有一个压板,所述压板呈弧形状设置,所述抬升机构连接有间断触发机构,最终,实现压板对井筒外围结构层有效的压实功能,从而,确保了井筒能够与分层保持齐平,且无需工作人员手动操作,实现施工同步性,显著提升施工效率。
Inspection well maintenance and reinforcement and road structure layer layering synchronous construction structure
一种检查井维修加固与道路结构层分层同步施工结构
CHANG XIN (Autor:in) / XIE ZHEN (Autor:in) / YANG ZHONGGANG (Autor:in)
11.11.2022
Patent
Elektronische Ressource
Chinesisch
Europäisches Patentamt | 2020
|Multi-layer modular inspection well and road synchronous construction method
Europäisches Patentamt | 2021
|Method for synchronous construction of road base and inspection well
Europäisches Patentamt | 2021
|