Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Cable-stayed assembled passage bridge for emergency road section
The cable-stayed assembled passage bridge comprises a foundation, a first fixedly-mounted bearing plate is arranged above the left end of the foundation, and embedded steel bar columns connected with the foundation are arranged on the lower sides of the inner ends of the first fixedly-mounted bearing plate and a second fixedly-mounted bearing plate; the building tap bolt is arranged at the joint of the first fixed mounting bearing plate and the foundation, and a rubber ring is arranged on the outer side of the building tap bolt; and the hydraulic driving motor is mounted on the left side of the interior of the second fixed mounting bearing plate, and an adjusting rod is arranged at the left end of the hydraulic driving motor. According to the cable-stayed assembled passing bridge for the emergency road section, the problem that the bridge cannot be installed due to collapse of soil on the edge of a river or a sunken position is solved, telescopic adjustment is facilitated, the problem that a bridge deck slab is damaged and broken due to long-time walking of vehicles and personnel is solved, disassembly and replacement can be conducted, and the practical effect of the bridge is improved.
本发明公开了一种用于应急路段的斜拉式装配通行桥梁,包括地基,所述地基的左端上方设置有第一固定安装承接板,所述第一固定安装承接板和第二固定安装承接板的内端下侧设置有与地基相连接的预埋钢筋柱;建筑自攻螺栓,其设置在第一固定安装承接板和地基的连接处,所述建筑自攻螺栓的外侧设置有橡胶圈;液压驱动电机,其安装在第二固定安装承接板的内部左侧,所述液压驱动电机的左端设置有调节杆。该用于应急路段的斜拉式装配通行桥梁,避免因河流或凹陷处边缘土壤的陷落导致该装置无法安装的问题,有利于进行伸缩调节,避免长时间车辆人员走动会导致桥面板损坏破裂的问题,能够进行拆卸更换,且提高了该装置的实用效果。
Cable-stayed assembled passage bridge for emergency road section
The cable-stayed assembled passage bridge comprises a foundation, a first fixedly-mounted bearing plate is arranged above the left end of the foundation, and embedded steel bar columns connected with the foundation are arranged on the lower sides of the inner ends of the first fixedly-mounted bearing plate and a second fixedly-mounted bearing plate; the building tap bolt is arranged at the joint of the first fixed mounting bearing plate and the foundation, and a rubber ring is arranged on the outer side of the building tap bolt; and the hydraulic driving motor is mounted on the left side of the interior of the second fixed mounting bearing plate, and an adjusting rod is arranged at the left end of the hydraulic driving motor. According to the cable-stayed assembled passing bridge for the emergency road section, the problem that the bridge cannot be installed due to collapse of soil on the edge of a river or a sunken position is solved, telescopic adjustment is facilitated, the problem that a bridge deck slab is damaged and broken due to long-time walking of vehicles and personnel is solved, disassembly and replacement can be conducted, and the practical effect of the bridge is improved.
本发明公开了一种用于应急路段的斜拉式装配通行桥梁,包括地基,所述地基的左端上方设置有第一固定安装承接板,所述第一固定安装承接板和第二固定安装承接板的内端下侧设置有与地基相连接的预埋钢筋柱;建筑自攻螺栓,其设置在第一固定安装承接板和地基的连接处,所述建筑自攻螺栓的外侧设置有橡胶圈;液压驱动电机,其安装在第二固定安装承接板的内部左侧,所述液压驱动电机的左端设置有调节杆。该用于应急路段的斜拉式装配通行桥梁,避免因河流或凹陷处边缘土壤的陷落导致该装置无法安装的问题,有利于进行伸缩调节,避免长时间车辆人员走动会导致桥面板损坏破裂的问题,能够进行拆卸更换,且提高了该装置的实用效果。
Cable-stayed assembled passage bridge for emergency road section
一种用于应急路段的斜拉式装配通行桥梁
ZHANG CHAO (Autor:in) / YU SHUQIN (Autor:in) / LI XIAOHUI (Autor:in) / LI XUSHENG (Autor:in) / TIAN QIMING (Autor:in)
22.11.2022
Patent
Elektronische Ressource
Chinesisch
IPC:
E01D
BRIDGES
,
Brücken
CABLE-STAYED BRIDGE AND CABLE-STAYED BRIDGE CONSTRUCTION METHOD
Europäisches Patentamt | 2020
|Cable-stayed bridge cable beam anchoring structure and cable-stayed bridge
Europäisches Patentamt | 2020
|Europäisches Patentamt | 2020
|