Earth excavation construction method for quickening long-distance wetland revetment of dry river channel
The invention relates to an earthwork excavation construction method of a dry-up river channel for accelerating long-distance wetland revetment, and aims to solve the problems that road traffic basically does not exist on both banks of a route through which river water flows generally, and both banks of the river channel are basic farmlands. Linear engineering earthwork is slow, and the construction period is correspondingly prolonged, so that the engineering management and mechanical operation cost is increased; according to the rapid construction method for long-distance river channel cleaning, earthwork vehicle traffic guidance is achieved through early-stage temporary road arrangement, river channel bank protection construction is conducted alternately, the temporary land acquisition area is reduced, the earthwork vehicle and mechanical operation speed is increased, and the construction period is shortened. And reutilization of temporary road block stones in earthwork operation and bank protection construction of a green shore cage and a shore fixing cushion are realized. The overall project period is shortened, and project cost is reduced.
本发明涉及一种加快长距离湿地护岸的干枯河道的土方开挖施工方法,通常情况下河水流经的路线两岸基本没有道路交通,河道两岸均为基本农田,为解决现有水利长距离干枯河道土方作业时在交通运输条件不利,线性工程土方作业缓慢,工期相应延长而导致工程管理、机械作业成本增加;本发明提供一种长距离河道清理快速施工的方法,通过前期临时道路的布置实现土方车辆交通导向,并穿插河道护岸施工,减少了临时征地面积,提高了土方车辆、机械运转速率,实现了土方作业临时道路块石再利用与绿滨笼、固滨垫护岸施工。缩短工程整体工期,降低工程成本。
Earth excavation construction method for quickening long-distance wetland revetment of dry river channel
The invention relates to an earthwork excavation construction method of a dry-up river channel for accelerating long-distance wetland revetment, and aims to solve the problems that road traffic basically does not exist on both banks of a route through which river water flows generally, and both banks of the river channel are basic farmlands. Linear engineering earthwork is slow, and the construction period is correspondingly prolonged, so that the engineering management and mechanical operation cost is increased; according to the rapid construction method for long-distance river channel cleaning, earthwork vehicle traffic guidance is achieved through early-stage temporary road arrangement, river channel bank protection construction is conducted alternately, the temporary land acquisition area is reduced, the earthwork vehicle and mechanical operation speed is increased, and the construction period is shortened. And reutilization of temporary road block stones in earthwork operation and bank protection construction of a green shore cage and a shore fixing cushion are realized. The overall project period is shortened, and project cost is reduced.
本发明涉及一种加快长距离湿地护岸的干枯河道的土方开挖施工方法,通常情况下河水流经的路线两岸基本没有道路交通,河道两岸均为基本农田,为解决现有水利长距离干枯河道土方作业时在交通运输条件不利,线性工程土方作业缓慢,工期相应延长而导致工程管理、机械作业成本增加;本发明提供一种长距离河道清理快速施工的方法,通过前期临时道路的布置实现土方车辆交通导向,并穿插河道护岸施工,减少了临时征地面积,提高了土方车辆、机械运转速率,实现了土方作业临时道路块石再利用与绿滨笼、固滨垫护岸施工。缩短工程整体工期,降低工程成本。
Earth excavation construction method for quickening long-distance wetland revetment of dry river channel
一种加快长距离湿地护岸的干枯河道的土方开挖施工方法
YE YUQIANG (Autor:in) / SUN JIANJIE (Autor:in) / ZHAI GAOHUI (Autor:in) / LIANG FUHUA (Autor:in) / LI ZONGQING (Autor:in)
22.11.2022
Patent
Elektronische Ressource
Chinesisch
Europäisches Patentamt | 2024
|River channel revetment laying construction method for hydraulic engineering
Europäisches Patentamt | 2020
|River channel revetment laying construction method for hydraulic engineering
Europäisches Patentamt | 2020
|