Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Attached lifting scaffold and construction method thereof
The invention discloses an attached lifting scaffold and a construction method thereof.The attached lifting scaffold comprises a first scaffold board, a second scaffold board and a third scaffold board, the third scaffold board is movably installed on the upper portion of the second scaffold board, and the first scaffold board is movably installed on the lower portion of the second scaffold board; guide rails are arranged on one side of the first scaffold board, one side of the second scaffold board and one side of the third scaffold board, anti-falling blocks are installed on the side edges of the first scaffold board, the second scaffold board and the third scaffold board, a lifting frame is fixedly installed on the lower portion of the third scaffold board, and a double-connection frame is fixedly installed on the lower portion of the second scaffold board; a user can adjust the using height of the first scaffold board or the second scaffold board at will according to the using height, the using flexibility of the scaffold is improved, the scaffold is provided with a lifting adjusting structure by utilizing the electric hoist to be matched with the first scaffold board, the second scaffold board and the third scaffold board of the lifting structure, and the using flexibility of the scaffold is improved.
本发明公开一种附着式升降脚手架及其施工方法,包括第一脚手板、第二脚手板和第三脚手板,所述第三脚手板活动安装在第二脚手板的上部,所述第一脚手板活动安装在第二脚手板的下部,所述第一脚手板、第二脚手板和第三脚手板的一侧均设有导轨,所述第一脚手板、第二脚手板和第三脚手板的侧边均安装有防坠块,所述第三脚手板的下部固定安装有提升框架,所述第二脚手板的下部固定安装有双连接框架;使用者可以根据使用高度任意调节第一脚手板或第二脚手板的使用高度,提升其使用时的灵活,利用电动葫芦配合升降式结构的第一脚手板、第二脚手板和第三脚手板,使得该脚手架具有升降式调节结构,提升其使用时的灵活性。
Attached lifting scaffold and construction method thereof
The invention discloses an attached lifting scaffold and a construction method thereof.The attached lifting scaffold comprises a first scaffold board, a second scaffold board and a third scaffold board, the third scaffold board is movably installed on the upper portion of the second scaffold board, and the first scaffold board is movably installed on the lower portion of the second scaffold board; guide rails are arranged on one side of the first scaffold board, one side of the second scaffold board and one side of the third scaffold board, anti-falling blocks are installed on the side edges of the first scaffold board, the second scaffold board and the third scaffold board, a lifting frame is fixedly installed on the lower portion of the third scaffold board, and a double-connection frame is fixedly installed on the lower portion of the second scaffold board; a user can adjust the using height of the first scaffold board or the second scaffold board at will according to the using height, the using flexibility of the scaffold is improved, the scaffold is provided with a lifting adjusting structure by utilizing the electric hoist to be matched with the first scaffold board, the second scaffold board and the third scaffold board of the lifting structure, and the using flexibility of the scaffold is improved.
本发明公开一种附着式升降脚手架及其施工方法,包括第一脚手板、第二脚手板和第三脚手板,所述第三脚手板活动安装在第二脚手板的上部,所述第一脚手板活动安装在第二脚手板的下部,所述第一脚手板、第二脚手板和第三脚手板的一侧均设有导轨,所述第一脚手板、第二脚手板和第三脚手板的侧边均安装有防坠块,所述第三脚手板的下部固定安装有提升框架,所述第二脚手板的下部固定安装有双连接框架;使用者可以根据使用高度任意调节第一脚手板或第二脚手板的使用高度,提升其使用时的灵活,利用电动葫芦配合升降式结构的第一脚手板、第二脚手板和第三脚手板,使得该脚手架具有升降式调节结构,提升其使用时的灵活性。
Attached lifting scaffold and construction method thereof
一种附着式升降脚手架及其施工方法
CAI WUHE (Autor:in) / LI XIANGFEI (Autor:in) / BAO FEIXIANG (Autor:in) / YANG SHENG (Autor:in) / DONG ZHIYONG (Autor:in)
06.12.2022
Patent
Elektronische Ressource
Chinesisch
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Attached lifting scaffold and construction method thereof
Europäisches Patentamt | 2022
|Integrated attached lifting scaffold and construction method thereof
Europäisches Patentamt | 2020
|