Modularized construction method for special-shaped curtain wall steel framework
The invention discloses a modularized construction method for a special-shaped curtain wall steel skeleton. Comprising the following steps of building an outer facade steel skeleton model through three-dimensional software, correcting the outer facade steel skeleton model, carrying out modularization treatment on an outer facade steel skeleton, carrying out site construction measurement and setting-out, installing a transverse keel and a connecting piece, splicing the steel skeleton, hoisting the steel skeleton, installing an aluminum plate, and carrying out gluing cleaning and inspection. According to the construction technology, the measurement workload is greatly reduced, the possibility of occurrence of measurement errors is reduced, and the construction technology adopts a crane and a high-altitude vehicle (a straight-arm vehicle or a crank-arm vehicle) for cooperative construction, so that the limitation of basket or scaffold construction in traditional measures is avoided, the high-altitude operation time is shortened, and the construction efficiency is improved. And meanwhile, welding fire prevention and fire welding work management are facilitated, the welding smoke purifier is convenient to place, smoke generated by welding can be effectively purified, the environmental protection problem is effectively solved, and the construction cost is reduced.
本发明公开了一种异形幕墙钢骨架模块化施工方法,包括以下步骤:通过三维软件建立外立面钢骨架模建立外立面钢骨架模型并对模型进行修正、外立面钢骨架模块化处理、现场施工测量放线、横向龙骨及连接件安装、钢骨架拼装、钢骨架吊装、铝板安装、打胶清洗与检验,本施工技术极大地减少了测量工作量,降低了测量误差发生的可能性,并且本施工技术通过采用吊车与高空车(直臂车或曲臂车)配合施工,避免了传统措施吊篮或脚手架施工的局限性,减少了高空作业的时间,同时有利于焊接防火及接火工作的管理,焊烟净化器摆放方便,能有效净化因焊接产生的烟雾,有效的解决了环保问题,降低了施工成本。
Modularized construction method for special-shaped curtain wall steel framework
The invention discloses a modularized construction method for a special-shaped curtain wall steel skeleton. Comprising the following steps of building an outer facade steel skeleton model through three-dimensional software, correcting the outer facade steel skeleton model, carrying out modularization treatment on an outer facade steel skeleton, carrying out site construction measurement and setting-out, installing a transverse keel and a connecting piece, splicing the steel skeleton, hoisting the steel skeleton, installing an aluminum plate, and carrying out gluing cleaning and inspection. According to the construction technology, the measurement workload is greatly reduced, the possibility of occurrence of measurement errors is reduced, and the construction technology adopts a crane and a high-altitude vehicle (a straight-arm vehicle or a crank-arm vehicle) for cooperative construction, so that the limitation of basket or scaffold construction in traditional measures is avoided, the high-altitude operation time is shortened, and the construction efficiency is improved. And meanwhile, welding fire prevention and fire welding work management are facilitated, the welding smoke purifier is convenient to place, smoke generated by welding can be effectively purified, the environmental protection problem is effectively solved, and the construction cost is reduced.
本发明公开了一种异形幕墙钢骨架模块化施工方法,包括以下步骤:通过三维软件建立外立面钢骨架模建立外立面钢骨架模型并对模型进行修正、外立面钢骨架模块化处理、现场施工测量放线、横向龙骨及连接件安装、钢骨架拼装、钢骨架吊装、铝板安装、打胶清洗与检验,本施工技术极大地减少了测量工作量,降低了测量误差发生的可能性,并且本施工技术通过采用吊车与高空车(直臂车或曲臂车)配合施工,避免了传统措施吊篮或脚手架施工的局限性,减少了高空作业的时间,同时有利于焊接防火及接火工作的管理,焊烟净化器摆放方便,能有效净化因焊接产生的烟雾,有效的解决了环保问题,降低了施工成本。
Modularized construction method for special-shaped curtain wall steel framework
一种异形幕墙钢骨架模块化施工方法
TANG WEIJUN (Autor:in) / YU CHANGJIANG (Autor:in) / ZHANG SHAOSHUAI (Autor:in) / YANG GUOHUA (Autor:in) / DAI LINSHEN (Autor:in)
06.12.2022
Patent
Elektronische Ressource
Chinesisch
Special-shaped curtain wall framework connecting joint and construction method thereof
Europäisches Patentamt | 2023
|