Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Steel structure corridor construction method
The invention relates to the technical field of corridor construction, and discloses a steel structure corridor construction method which comprises the following steps that a sliding pipe is laid at the position of a concrete bracket, and an electric hoist is installed; the main beam is hoisted to the position above the sliding pipe, and the electric hoist is used for dragging the main beam; after the main beam is in place, the original point of the main beam is reset, and welding is conducted; a movable hanging basket is erected between the two main beams; and the hanging basket is used for installing the secondary beam. The main beams are hoisted in a hoisting mode, the secondary beams are installed in a hanging basket sliding mode, and only the steel beams need to be hoisted, so that the use tonnage of the truck crane is greatly reduced, the corridor construction cost is reduced, and potential safety hazards are avoided; the electric hoist is matched with the sliding pipe to drag the main beam for construction, and the corridor main beam mounting efficiency is improved; the hanging basket moving operation platform is used for installing the secondary beam, the hanging basket moving operation platform can move on the corridor main beam, secondary beam installation is rapidly completed, the secondary beam installation efficiency is improved, and high-altitude operation safety is ensured.
本发明涉及连廊施工技术领域,公开了一种钢结构连廊施工方法,包括以下步骤:在混泥土牛腿位置铺设滑管,并安装电动葫芦;将主梁吊至滑管上方,并用所述电动葫芦牵引主梁;主梁就位后对其进行原点复位,并进行焊接;在两根主梁之间架设可移动挂篮;利用所述挂篮安装次梁。本发明采用吊装的方式吊运主梁,采用滑移挂篮的方式安装次梁,只需吊运钢梁,从而大大降低了汽车吊的使用吨位,减少了连廊施工成本,也避免了安全隐患;利用电动葫芦与滑管配合牵引主梁施工,提高了连廊主梁安装效率;利用挂篮移动操作平台安装次梁,可以在连廊主梁上移动,实现快速完成次梁安装,提高了次梁安装效率,且确保高空作业安全。
Steel structure corridor construction method
The invention relates to the technical field of corridor construction, and discloses a steel structure corridor construction method which comprises the following steps that a sliding pipe is laid at the position of a concrete bracket, and an electric hoist is installed; the main beam is hoisted to the position above the sliding pipe, and the electric hoist is used for dragging the main beam; after the main beam is in place, the original point of the main beam is reset, and welding is conducted; a movable hanging basket is erected between the two main beams; and the hanging basket is used for installing the secondary beam. The main beams are hoisted in a hoisting mode, the secondary beams are installed in a hanging basket sliding mode, and only the steel beams need to be hoisted, so that the use tonnage of the truck crane is greatly reduced, the corridor construction cost is reduced, and potential safety hazards are avoided; the electric hoist is matched with the sliding pipe to drag the main beam for construction, and the corridor main beam mounting efficiency is improved; the hanging basket moving operation platform is used for installing the secondary beam, the hanging basket moving operation platform can move on the corridor main beam, secondary beam installation is rapidly completed, the secondary beam installation efficiency is improved, and high-altitude operation safety is ensured.
本发明涉及连廊施工技术领域,公开了一种钢结构连廊施工方法,包括以下步骤:在混泥土牛腿位置铺设滑管,并安装电动葫芦;将主梁吊至滑管上方,并用所述电动葫芦牵引主梁;主梁就位后对其进行原点复位,并进行焊接;在两根主梁之间架设可移动挂篮;利用所述挂篮安装次梁。本发明采用吊装的方式吊运主梁,采用滑移挂篮的方式安装次梁,只需吊运钢梁,从而大大降低了汽车吊的使用吨位,减少了连廊施工成本,也避免了安全隐患;利用电动葫芦与滑管配合牵引主梁施工,提高了连廊主梁安装效率;利用挂篮移动操作平台安装次梁,可以在连廊主梁上移动,实现快速完成次梁安装,提高了次梁安装效率,且确保高空作业安全。
Steel structure corridor construction method
一种钢结构连廊施工方法
CHEN DINGJUN (Autor:in) / HUANG HOUJUN (Autor:in) / HE ZHIJUN (Autor:in) / OUYANG JIAN (Autor:in) / YUAN XIN (Autor:in) / LI DONG (Autor:in) / ZHANG QIMING (Autor:in) / DONG DONG (Autor:in)
09.12.2022
Patent
Elektronische Ressource
Chinesisch
Large-span steel structure corridor construction method
Europäisches Patentamt | 2024
|Construction method suitable for steel structure corridor
Europäisches Patentamt | 2023
|Steel structure corridor structure and hoisting construction method
Europäisches Patentamt | 2020
|Steel structure corridor support and construction method thereof
Europäisches Patentamt | 2024
|Steel structure corridor support and construction method thereof
Europäisches Patentamt | 2024
|